Quick answers
What is this project?
Enhancement of Iron Ore Wet Beneficiation Plant from 0.64 Million TPA (0.914 Million TPA Throughput) to 0.674 Million TPA (1.0 Million TPA Throughput) through modernization is an approved mining project in Santona, Sanguem, South Goa, Goa. The site covers 39 acres.
Who is building it?
The applicant is Sociedade De Fomento Industrial Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Mar 2025), as of 27 Nov 2026.
Where is it?
In Santona, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹79.4 crore and a site of 39 acres.
When was it filed?
The application was filed on 16 Jan 2025.
Project details
| Official title | Enhancement of Iron Ore Wet Beneficiation Plant from 0.64 Million TPA (0.914 Million TPA Throughput) to 0.674 Million TPA (1.0 Million TPA Throughput) through modernization at Village Santona, Sanguem Taluka, South Goa District, Goa by M/s. Greater Ferromet (Division of Sociedade De Fomento Industrial Private Limited). |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Mar 2025 |
| Application filed | 16 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Sociedade De Fomento Industrial Private Limited |
| Land area | 39 acres (15.8 ha) |
| Project cost | ₹79.4 crore |
| Village / locality | Santona |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00088 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Jan 2025 (this page) | Environmental approval granted | 39 acres | ₹79.4 crore |
| Early planning filed 10 Feb 2024 | Cleared for impact study | 39 acres | ₹79.4 crore |
In context
67 applications in South Goa since January 2022 are in the same category (Mining): 36 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 39 acres, this one is larger than 70% of them.
No other mining lease on record is within 500 m of this site; 23 have applied within 5 km.
Where it is
Santona, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Enhancement of Iron Ore Wet Beneficiation Plant from 0.64 Million TPA (0.914… — cleared for impact study, 50 m away
- Iron Ore Dump Handling at Dump-14, located in Survey No. 38/2(P) of Cormonem… — initial checks, 900 m away
- Handling of Iron Ore dump Situated Outside the Lease Area on Private property… — environmental approval granted, 1.2 km away
- Iron Ore Dump Handling at 'DUMP NO. 15' (E Auctioned Mine Dump), located at… — returned to applicant, 1.3 km away
- Iron Ore Dump Handling at 'DUMP NO. 15' (E Auctioned Mine Dump), for… — under environmental review, 1.3 km away
- Block IV – Kalay Mineral Block — environmental approval granted, 1.6 km away
- Block IV – Kalay Mineral Block — forest land use approved, 1.6 km away
- Block IV – Kalay Mineral Block — cleared for impact study, 1.6 km away
All 6 Sociedade De Fomento projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.