Quick answers
What is this project?
Industrial Shed by M/s.Centaur Pharmaceuticals Private Limited is an approved industrial building project in Lotli, Salcete, South Goa, Goa. It plans buildings of up to 3 floors on 10.5 acres.
Who is building it?
The applicant is Shivanand Dattatraya Sawant.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Aug 2026), as of 27 Nov 2026.
Where is it?
In Lotli, Salcete, South Goa, Goa.
How big is it?
It has a stated cost of ₹42.3 crore and a site of 10.5 acres.
When was it filed?
The application was filed on 9 Jan 2026.
Project details
| Official title | Proposed Construction of Industrial Shed by M/s.Centaur Pharmaceuticals Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 Aug 2026 |
| Application filed | 9 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shivanand Dattatraya Sawant |
| Use | Industrial |
| Floors (tallest) | 3 |
| Basements | 1 |
| Height | 15 m |
| Parking spaces | 1,492 |
| Land area | 10.5 acres (4.2 ha) |
| Built-up area | 48,102 m² (5,17,765 sq ft) |
| Plot area | 42,300 m² (4,55,313 sq ft) |
| Project cost | ₹42.3 crore |
| Village / locality | Lotli |
| Taluk / tehsil | Salcete |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00214 |
In context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 10.5 acres, this one is larger than 73% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lotli, Salcete, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 250 TPD Waste to Energy facility — lapsed, 1.1 km away
- Vijai Marine Services PVT LTD - Shed — lapsed, 2 km away
- Proposed Laterite Rubble Quarry of Lease Area 2 Ha Located on land bearing… — environmental approval granted, 2 km away
- Lupin Limited GOA Unit — initial checks, 4.2 km away
- Proposed Quarrying of Laterite/Chira Stone in an area of 1.12 Ha. at Sy.No:… — environmental approval granted, 6.4 km away
- Residential-cum-commercial project 'Ferrum Heights' on property bearing Chalta… — environmental approval granted, 6.4 km away
- 1 No. Building (housing Conference Hall, Entertainment zone, Stilt parking)… — more information requested, 6.9 km away
- Erection of Temporary Structure for Running a Boutique — lapsed, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.