Quick answers
What is Request to Provide Access Road?
Request to Provide Access Road is a lapsed road project in Bally, Quepem, South Goa, Goa. It seeks 102.7 acres of forest land.
Who is building it?
The applicant is Mahesh Keny.
Has it been approved?
No. The application was lapsed on 28 Mar 2024, so it is no longer under consideration.
Where is it?
In Bally, Quepem, South Goa, Goa.
How big is it?
It has 102.7 acres (41.6 ha) of forest land.
When was it filed?
The application was filed on 28 Mar 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Mar 2024 |
| Application filed | 28 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mahesh Keny |
| Forest land | 102.7 acres (41.6 ha) |
| Village / locality | Bally |
| Taluk / tehsil | Quepem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00239 |
In context
13 applications in South Goa since January 2022 are in the same category (Roads & highways): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bally, Quepem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of production capacity from 100000 TPA to 150000 TPA at… — cleared for impact study, 3.9 km away
- "proposed Installation of Two Induction Furnace of Capacities 15t Each to… — more information requested, 4.2 km away
- Industrial project by John Distilleries Private Limited — environmental approval granted, 4.4 km away
- Proposed Expansion of MS Billet & TMT Bars manufacturing unit of M/s Global… — cleared for impact study, 4.4 km away
- Laterite Boulder Quarry with lease area 0.924464 Ha located on land bearing… — environmental approval granted, 4.5 km away
- Proposed production of 43200 TPA of MS Ingots/Billets, Runners & Risers by… — more information requested, 4.5 km away
- Transfer of EC(s) from M/s. MALCO Energy Limited to M/s. Vedanta Limited [for… — under environmental review, 4.7 km away
- Proposed Amendment in existing Environmental Clearance for "Expansion of… — environmental approval granted, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.