What is Developing? Open the mapMap

Under environmental reviewIndustry · South Goa, Goa

Transfer of EC(s) from M/s. MALCO Energy Limited to M/s. Vedanta Limited [for EC vide letter no. J-11011/106/2008-IA-II (I) dated 28.10.2009 issued to M/s. NICOMET Industries Limited and further transferred to M/s. MALCO Energy Limited vide letter dated 31.10.2022 and amended EC vide letter no. IA-J-11011/106/2008-IA-II(IND-I) dated 04.03.2024] at Plot No. L-15, L-19 & L- 20 Cuncolim Industrial Estate, Cuncolim, Goa

Transfer of EC(s) from M/s. MALCO Energy Limited to M/s. Vedanta Limited [for EC vide letter no. J-11011/106/2008-IA-II (I) dated 28.10.2009 issued to M/s. NICOMET Industries Limited and further transferred to M/s. MALCO Energy Limited vide letter dated 31.10.2022 and amended EC vide letter no. IA-J-11011/106/2008-IA-II(IND-I) dated 04.03.2024] at Plot No. L-15, L-19 & L- 20 Cuncolim Industrial Estate, Cuncolim, Goa is a proposed industrial project in Veroda, Salcete, South Goa, Goa. The site covers 8.5 acres. Its stated project cost is ₹107.8 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 19 Nov 2026).

See it on the live map All projects in South Goa

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Transfer of EC(s) from M/s. MALCO Energy Limited to M/s. Vedanta Limited [for EC vide letter no. J-11011/106/2008-IA-II (I) dated 28.10.2009 issued to M/s. NICOMET Industries Limited and further transferred to M/s. MALCO Energy Limited vide letter dated 31.10.2022 and amended EC vide letter no. IA-J-11011/106/2008-IA-II(IND-I) dated 04.03.2024] at Plot No. L-15, L-19 & L- 20 Cuncolim Industrial Estate, Cuncolim, Goa is a proposed industrial project in Veroda, Salcete, South Goa, Goa. The site covers 8.5 acres.

Who is building it?

The applicant is Vedanta limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Veroda, Salcete, South Goa, Goa.

How big is it?

It has a stated cost of ₹107.8 crore and a site of 8.5 acres.

When was it filed?

The application was filed on 30 Oct 2026.

Project details

StatusUnder environmental review
Status since19 Nov 2026
Application filed30 Oct 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantVedanta limited
Land area8.5 acres (3.4 ha)
Project cost₹107.8 crore
Village / localityVeroda
Taluk / tehsilSalcete
DistrictSouth Goa
StateGoa
Location fromSite boundary on record
Our referenceWID-GA-00410

In context

12 applications in South Goa since January 2022 are in the same category (Industry): 6 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 8.5 acres, this one is larger than 50% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Veroda, Salcete, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 76 Vedanta Limited(Division Cairn projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.