Quick answers
What is GOI USOF BSNL 4G Saturation Project at Calem (Devnamol)?
GOI USOF BSNL 4G Saturation Project at Calem (Devnamol) is an approved project in Calem, Sanguem, South Goa, Goa. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Sept 2025), as of 27 Nov 2026.
Where is it?
In Calem, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹30 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 23 Feb 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Sept 2025 |
| Application filed | 23 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Calem |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00244 |
In context
31 applications in South Goa since January 2022 are in the same category (Other): 7 approved, 11 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0 acres, this one is smaller than 96% of them.
37 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Calem, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Block IV – Kalay Mineral Block — cleared for impact study, 1.2 km away
- Block IV – Kalay Mineral Block — environmental approval granted, 1.2 km away
- Block IV – Kalay Mineral Block — forest land use approved, 1.2 km away
- Block IV – Kalay Mineral Block — cleared for impact study, 1.2 km away
- Enhancement of Iron Ore Wet Beneficiation Plant from 0.64 Million TPA (0.914… — cleared for impact study, 1.8 km away
- Enhancement of Iron Ore Wet Beneficiation Plant from 0.64 Million TPA (0.914… — environmental approval granted, 1.8 km away
- Handling of Iron Ore Dump No. 5 by M/s. Wertvoll Resources LLP — under environmental review, 2 km away
- Handling of Iron Ore Dump No. 5 by M/s. Wertvoll Resources LLP — returned to applicant, 2 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Cumbari — under forest review
- 4G Saturation at Village Viliena — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.