Quick answers
What is Development of Monem Tank in V.P Cotigao Canacona Taluka?
Development of Monem Tank in V.P Cotigao Canacona Taluka is a lapsed water and irrigation project in Gaundongren, Canacona, South Goa, Goa. The site covers 0.5 acres.
Who is building it?
The applicant is Assistant Engineer, Sd I, Wd Xi, Wrd, Canacona, Goa.
Has it been approved?
No. The application was lapsed on 6 Sept 2025, so it is no longer under consideration.
Where is it?
In Gaundongren, Canacona, South Goa, Goa.
How big is it?
It has a stated cost of ₹99 lakh; a site of 0.5 acres and 680 m² of forest land.
When was it filed?
The application was filed on 31 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Sept 2025 |
| Application filed | 31 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Assistant Engineer, Sd I, Wd Xi, Wrd, Canacona, Goa |
| Land area | 2,100 m² |
| Forest land | 680 m² |
| Project cost | ₹99 lakh |
| Village / locality | Gaundongren |
| Taluk / tehsil | Canacona |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00263 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gaundongren, Canacona, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks, 2.5 km away
- GoI USOF BSNL 4G Saturation Project at Cotigao Aouli — forest land use approved, 3.4 km away
- Forest Land Diversion for Reconstruction of Existing Kuccha Road — decision issued, 4.6 km away
- Forest Land Diversion for Reconstruction of Existing Kuccha Road — lapsed, 4.6 km away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — decision issued, 4.6 km away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — forest land use approved, 4.6 km away
- GOI USOF BSNL 4G Saturation Project at Kuske-Yeda — forest land use approved, 5 km away
- Conversion of 11KV Overhead network of Marli Tirwal Feeder to Underground HT… — in-principle approval, conditions pending, 5.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.