Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 20 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Naneli |
| Taluk / tehsil | Satari |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00266 |
In context
21 applications in North Goa since January 2022 are in the same category (Other): 6 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naneli, Satari, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI USOF BSNL 4G Saturation Project — forest land use approved, 1.8 km away
- GOI USOF BSNL 4G Saturation Project — decision issued, 1.8 km away
- GOI USOF BSNL 4G Saturation Project at Sigonem, North Goa — forest land use approved, 3 km away
- GOI USOF BSNL 4G Saturation Project at Sigonem, North Goa — decision issued, 3 km away
- GOI USOF BSNL 4G Saturation Project at Maloli — forest land use approved, 4.7 km away
- GOI USOF BSNL 4G Saturation Project at village Dabem, North Goa — decision issued, 4.8 km away
- GOI USOF BSNL 4G Saturation Project at village Dabem, North Goa — forest land use approved, 4.8 km away
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks, 5 km away
More from Mahesh Nair in North Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — initial checks
- GOI USOF BSNL 4G Saturation Project at Codal — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — more information requested
- GOI USOF BSNL 4G Saturation Project at Codal — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.