Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 Aug 2025 |
| Application filed | 25 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Use | Other |
| Towers | 1 |
| Land area | 200 m² |
| Forest land | 200 m² |
| Plot area | 200 m² (2,153 sq ft) |
| Project cost | ₹30 lakh |
| Village / locality | Dabem |
| Taluk / tehsil | Satari |
| District | North Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00268 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Sept 2023 (this page) | Forest land use approved | 0 acres | ₹30 lakh |
| New project filed 23 Sept 2023 | Decision issued | 0 acres | ₹30 lakh |
In context
74 applications in North Goa since January 2022 are in the same category (Buildings & townships): 39 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dabem, Satari, North Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI USOF BSNL 4G Saturation Project at village Dabem, North Goa — decision issued, 0 m away
- Proposed Expansion of Sponge Iron Unit into Integrated Steel Plant of M/s.… — environmental approval granted, 4.6 km away
- GOI USOF BSNL 4G Saturation Project at Naneli — forest land use approved, 4.8 km away
- Greenfield 2 x 300 KLPD Grain based Ethanol/ENA Plant, 2 x 7.0 MW… — environmental approval granted, 5.9 km away
- Pissurlem Mineral Block XVI (Area: 105.6788 ha) with proposed Iron Ore… — under environmental review, 6.5 km away
- Laterite Stone Quarry with a lease area of 5.00 Ha located on land bearing… — environmental approval granted, 6.5 km away
- GOI USOF BSNL 4G Saturation Project — forest land use approved, 6.6 km away
- GOI USOF BSNL 4G Saturation Project — decision issued, 6.6 km away
More from Mahesh Nair in North Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — initial checks
- GOI USOF BSNL 4G Saturation Project at Codal — under wildlife review
- GOI USOF BSNL 4G Saturation Project at Codal — more information requested
- GOI USOF BSNL 4G Saturation Project at Codal — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.