Quick answers
What is 4G Saturation at Village Cumbari?
4G Saturation at Village Cumbari is a proposed building project in Kumbari, Sanguem, South Goa, Goa. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kumbari, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0 acres.
When was it filed?
The application was filed on 27 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 4G Saturation at Village Cumbari
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 27 Jun 2026 |
| Application filed | 27 Jun 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Kumbari |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00357 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Jun 2026 | Under forest review | 0 acres | ₹30 lakh |
| New project filed 27 Jun 2026 (this page) | Under wildlife review | 0 acres | ₹30 lakh |
In context
59 applications in South Goa since January 2022 are in the same category (Buildings & townships): 23 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kumbari, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation at Village Cumbari — under forest review, 0 m away
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested, 800 m away
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested, 800 m away
- 4G Saturation at Village Viliena — under forest review, 1.3 km away
- 4G Saturation at Village Viliena — under wildlife review, 1.3 km away
- GOI USOF BSNL 4G Saturation Project at village Naiquinim — decision issued, 3.4 km away
- GOI USOF BSNL 4G Saturation Project at village Naiquinim — forest land use approved, 3.4 km away
- Residential House Up to 250 Sq. Mtrs. As Per the Moef&cc Guideline Dated… — initial checks, 4 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Viliena — under wildlife review
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC (W/L) — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.