Quick answers
What is this project?
GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC (W/L) is a proposed telecom project in Netravli, Sanguem, South Goa, Goa.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Netravli, Sanguem, South Goa, Goa.
How big is it?
It has a stated cost of ₹68 lakh.
When was it filed?
The application was filed on 5 Jun 2026.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 5 Jun 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Project cost | ₹68 lakh |
| Village / locality | Netravli |
| Taluk / tehsil | Sanguem |
| District | South Goa |
| State | Goa |
| Location from | Site boundary on record |
| Our reference | WID-GA-00354 |
In context
7 applications in South Goa since January 2022 are in the same category (Telecom): 0 approved, 7 filed or under review, and 0 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Netravli, Sanguem, South Goa, Goa. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC — under forest review, 450 m away
- GoI USOF BSNL 4G Saturation Project at Verlem for laying of O/H ADSS OFC — under wildlife review, 450 m away
- Proposal for Setting up of WiFi connectivity at Verlem and Tudav Village,… — more information requested, 2.1 km away
- GOI USOF BSNL 4G Saturation Project at village Vichundrem — forest land use approved, 6.6 km away
- GOI USOF BSNL 4G Saturation Project at Kuske-Yeda — forest land use approved, 6.9 km away
- GOI USOF BSNL 4G Saturation project — forest land use approved, 7.4 km away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — decision issued, 8.1 km away
- Estimate for Work of Electrification of Left-Out Wada at Keri, Under Vp… — forest land use approved, 8.1 km away
More from Mahesh Nair in South Goa
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — initial checks
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- Laying of underground Optical Fiber Cable for connecting the 4G Mobile Tower — more information requested
- 4G Saturation at Village Viliena — under forest review
- 4G Saturation at Village Cumbari — under forest review
- 4G Saturation at Village Viliena — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.