What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer (Nano-DAP), Kandla Unit

Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer (Nano-DAP), Kandla Unit is a proposed industrial project in Kidana, Gandhidham, Kachchh, Gujarat. The site covers 174 acres. Its stated project cost is ₹12.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Nov 2022).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer (Nano-DAP), Kandla Unit is a proposed industrial project in Kidana, Gandhidham, Kachchh, Gujarat. The site covers 174 acres.

Who is building it?

The applicant is Indian Farmers Fertiliser Cooperative Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Nov 2022), as of 27 Nov 2026.

Where is it?

In Kidana, Gandhidham, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹12.5 crore and a site of 174 acres.

When was it filed?

The application was filed on 4 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer (Nano-DAP),…

Project details

StatusCleared for impact study
Status since4 Nov 2022
Application filed4 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantIndian Farmers Fertiliser Cooperative Limited
Land area174 acres (70.4 ha)
Project cost₹12.5 crore
Village / localityKidana
Taluk / tehsilGandhidham
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00118

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 11 Sept 2023Environmental approval granted174 acres₹12.5 crore
Early planning filed 4 Nov 2022 (this page)Cleared for impact study174 acres₹12.5 crore

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 174 acres, this one is larger than 74% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kidana, Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Farmers Fertiliser Cooperative Limited in Kachchh

4 Indian Farmers Fertiliser projects in Kachchh
All 17 Indian Farmers Fertiliser projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.