CRZ Clearance for Vessel/Barge Repair Facility in Kandla Port at Kandla, Taluka Gandhidham, District Kachchh, State Gujarat is a proposed port and coastal project in Kandla (Ct), Gandhidham, Kachchh, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Rishi Shipping.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kandla (Ct), Gandhidham, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹84 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 24 Nov 2022.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Nov 2022 |
| Application filed | 24 Nov 2022 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Rishi Shipping |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹84 lakh |
| Village / locality | Kandla (Ct) |
| Taluk / tehsil | Gandhidham |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14797 |
In context
36 applications in Kachchh since January 2022 are in the same category (Ports & coast): 13 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kandla (Ct), Gandhidham, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA… — more information requested, 1.2 km away
- Modernization of Existing Fertilizer Plant for Manufacturing of Nano Npk… — environmental approval granted, 1.8 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — environmental approval granted, 1.8 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer… — cleared for impact study, 1.8 km away
- No Increase in Pollution Load for Proposed Change in Product Mix for… — initial checks, 1.8 km away
- Laying of 24" inch New HSD pipeline from Oil Jetty-06 to IFFCO chamber in… — coastal clearance granted, 2.1 km away
- CRZ Clearance for laying 2 Nos. x 24" NB Propane/ Butane/ LPG Pipeline from… — coastal clearance granted, 2.9 km away
- Environmental & CRZ Clearance for the Development, Operation & Maintenance of… — lapsed, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.