One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion For Proposed Project Synthetic Organic Chemicals (Resin) Manufacturing Unit Of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Nov 2022 |
| Application filed | 24 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Satvva Decor LLP |
| Land area | 10.5 acres (4.2 ha) |
| Project cost | ₹12.2 crore |
| Village / locality | Ravapar Nadi |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00138 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Jun 2023 | Environmental approval granted | 10.5 acres | ₹12.2 crore |
| Early planning filed 24 Nov 2022 (this page) | Cleared for impact study | 10.5 acres | ₹12.2 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.5 acres, this one is larger than 92% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ravapar Nadi, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion For Proposed Project Synthetic Organic Chemicals (Resin)… — environmental approval granted, 0 m away
- Diversion of 0.0024 Ha. of PF Land for laying of 6" Dia NB Steel Gas Pipeline… — forest land use approved, 1.3 km away
- 6" Dia NB Steel Gas Pipeline Connectivity from FDODO Satyam CNG Station,… — lapsed, 1.6 km away
- No Increase in Pollution load application of M/s. Matru Industries — initial checks, 2.5 km away
- No Increase in Pollution load application of M/s. Matru Industries — initial checks, 2.5 km away
- No Increase in Pollution load application of M/s. Matru Industries — initial checks, 2.5 km away
- Yogesh Park SR & Siddhi Vinayak Township & Siddhi Vinayak CNG to Lioli… — forest land use approved, 2.8 km away
- Industrial project by M/S. Reolaxe Lami Art LLP — returned to applicant, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.