What is Developing? Open the mapMap

LapsedPipelines · Morbi, Gujarat

6" Dia NB Steel Gas Pipeline Connectivity from FDODO Satyam CNG Station, Taluka: Morbi, District: Morbi.

6" Dia NB Steel Gas Pipeline Connectivity from FDODO Satyam CNG Station, Taluka: Morbi, District: Morbi is a lapsed pipeline project in Juna Sadulka, Morvi, Morbi, Gujarat. It seeks 0 acres of forest land. Its stated project cost is ₹4 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 8 Sept 2025).

See it on the live map All projects in Morbi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since8 Sept 2025
Application filed30 Jul 2025
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantGujarat Gas Limited
Forest land20 m²
Project cost₹4 lakh
Village / localityJuna Sadulka
Taluk / tehsilMorvi
DistrictMorbi
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13757

In context

19 applications in Morbi since January 2022 are in the same category (Pipelines): 16 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.

22 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Juna Sadulka, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Gas Limited in Morbi

18 Gujarat Gas projects in Morbi
All 289 Gujarat Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.