One of 2 filings for this project. The project's main page, with every filing and where each stands: PROPOSED EXPANSION PROJECT OF FORMALDEHYDE RESIN(PHENOL, MELAMINE & UREA) by M/S.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Nov 2022 |
| Application filed | 12 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Somyatouch Laminate |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹14.1 crore |
| Village / locality | Bahadurgadh |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00205 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Jul 2023 | Environmental approval granted | 2.9 acres | ₹14.1 crore |
| Early planning filed 12 Nov 2022 (this page) | Cleared for impact study | 2.9 acres | ₹14.1 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.9 acres, this one is smaller than 53% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahadurgadh, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED EXPANSION PROJECT OF FORMALDEHYDE RESIN(PHENOL, MELAMINE & UREA) by… — environmental approval granted, 0 m away
- Industrial project by M/s. Abhay Laminates LLP — environmental approval granted, 50 m away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — environmental approval granted, 1.2 km away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — cleared for impact study, 1.2 km away
- Diversion of 0.4036 Ha. of Protected Forest land for laying of 125mm dia PE… — forest land use approved, 1.4 km away
- Duragres Bathware LLP Connectivity & Shree Residency Connectivity — forest land use approved, 4.7 km away
- 66kV LILO to Rasangpar SS from proposed 66kV Jetpar Khirai Line with 1CX630 sq… — forest land use approved, 6.7 km away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — more information requested, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.