Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Oct 2024 |
| Application filed | 10 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 500 m² |
| Forest land | 520 m² |
| Project cost | ₹20 lakh |
| Village / locality | Vaghpar |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12450 |
In context
19 applications in Morbi since January 2022 are in the same category (Pipelines): 16 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is smaller than 71% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vaghpar, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.4036 Ha. of Protected Forest land for laying of 125mm dia PE… — forest land use approved, 3.3 km away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — environmental approval granted, 3.7 km away
- Expansion for Proposed Project of Synthetic Organic Chemicals (Resin)… — cleared for impact study, 3.7 km away
- Industrial project by M/s. Abhay Laminates LLP — environmental approval granted, 4.7 km away
- PROPOSED EXPANSION PROJECT OF FORMALDEHYDE RESIN(PHENOL, MELAMINE & UREA) by… — environmental approval granted, 4.7 km away
- PROPOSED EXPANSION PROJECT OF FORMALDEHYDE RESIN(PHENOL, MELAMINE & UREA) by… — cleared for impact study, 4.7 km away
- Diversion of 0.044 Hectare of Protected Forest Land for laying 125 MM dia. PE… — forest land use approved, 4.9 km away
- Expansion for existing Formaldehyde and Resin unit and proposed API unit of… — returned to applicant, 5.1 km away
More from Gujarat Gas Limited in Morbi
- Diversion of 0.002 HA. of PF land for SEGA TILES PVT LTD connectivity Taluka… — in-principle approval, conditions pending
- Diversion of 0.0024 Ha. of PF Land for laying of 6" Dia NB Steel Gas Pipeline… — forest land use approved
- Diversion of 0.044 Hectare of Protected Forest Land for laying 125 MM dia. PE… — forest land use approved
- 6" Dia NB Steel Gas Pipeline Connectivity From FDODO CNG Point Vajepar, Taluka… — forest land use approved
- 125 Mm Dia PE Pipeline for Extenson Of PE Pipeline For New Industrial… — forest land use approved
- 125/90 mm Dia PE Gas Pipeline for extension of PE Pipeline for New Domestic… — forest land use approved
18 Gujarat Gas projects in Morbi
All 289 Gujarat Gas projects across India