One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by M/s. Bizotic Lifescience Pvt. Ltd.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Apr 2023 |
| Application filed | 29 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bizotic Lifescience PVT LTD |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹8.8 crore |
| Village / locality | Kharachiya |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00227 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Jul 2024 | Environmental approval granted | 1.6 acres | ₹8.8 crore |
| Early planning filed 29 Apr 2023 (this page) | Cleared for impact study | 1.6 acres | ₹8.8 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.6 acres, this one is smaller than 66% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharachiya, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Bizotic Lifescience Pvt. Ltd. — environmental approval granted, 0 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Amran-Chachavadar… — lapsed, 4.9 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 5.8 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — under wildlife review, 6.3 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 6.3 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 6.3 km away
- 4-lane Greenfield Highway from Morbi to Navlakhi Port (connectivity for… — cleared for impact study, 6.3 km away
- Diversion of Protected Forest Land for widening of Morbi - Navlakhi Road… — lapsed, 6.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.