Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Jul 2026 |
| Application filed | 28 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer , R&B Division, Morbi |
| Forest land | 50.7 acres (20.5 ha) |
| Project cost | ₹164.8 crore |
| Village / locality | Barvala |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12544 |
In context
32 applications in Morbi since January 2022 are in the same category (Roads & highways): 10 approved, 14 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Barvala, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4-lane Greenfield Highway from Morbi to Navlakhi Port (connectivity for… — cleared for impact study, 700 m away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — under wildlife review, 700 m away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 700 m away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 700 m away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 950 m away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — cleared for impact study, 4.2 km away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — cleared for impact study, 5 km away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — cleared for impact study, 5 km away
More from Executive Engineer , R&B Division, Morbi in Morbi
- Diversion of Protected Forest Land for Widening of Existing Structures on… — under forest review
- Widening and Strengthening of Existing Halvad - Tikar SH-321 Road (0/00 to… — more information requested
- Widening of Existing Halvad - Tikar Road (SH-321) (0/00 to 18/00 km) Ta.Halvad… — more information requested
- Diversion of Protected Forest Land for Widening of Structures on Palas -… — lapsed
- Diversion of 1.06 Ha Protected forest land for the work of Construction of… — forest land use approved
- Road from Jamsar Chowkdi-Virpur Patia-Shivpur-Mathak -Kadiyana (Morbi - Halvad… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.