Quick answers
What is Atharva Elanza?
Atharva Elanza is an approved building project in Koba (Og), Gandhinagar, Gujarat. The site covers 1.8 acres.
Who is building it?
The applicant is Alpesh Shah.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Nov 2022), as of 27 Nov 2026.
Where is it?
In Koba (Og), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹29.8 crore and a site of 1.8 acres.
When was it filed?
The application was filed on 13 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Nov 2022 |
| Application filed | 13 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Alpesh Shah |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹29.8 crore |
| Village / locality | Koba (Og) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00414 |
What the filings say
What is planned
Atharva Elanza is a residential development proposed by AlpesH Shah in Koba, Gandhinagar. The project report describes a plan for two residential blocks, identified as Block A and Block B, rising to 13 floors above a hollow plinth (ground floor) and two basement levels.
The development is designed to accommodate 104 residential units and a small commercial component. According to the equity flats statement, each block will contain 52 residential units, with four units per floor from the 1st to the 13th level. The ground floor is designated for parking (hollow plinth) and includes a shop area.
Project Specifications
| Item | Detail |
|---|---|
| Total Units | 104 residential units |
| Building Configuration | 2 Basements + Ground + 13 Floors |
| Tallest Building Height | 44.97 metres (to terrace level) |
| Total Built-up Area | 13,856.83 square metres |
| F.S.I. Area | 12,705.42 square metres |
| Net Plot Area | 6,247.00 square metres |
| Common Plot Area | 638.72 square metres |
Layout and design
The site layout features two symmetrical blocks separated by a central common plot. Block A is positioned on the northern side and Block B on the southern side of the plot. A 30-metre wide Town Planning Scheme (TPS) road provides primary access to the site. Internal movement is facilitated by 6.0-metre wide approach roads and a 7.06-metre wide ramp leading to the basement levels.
The ground floor (hollow plinth) is primarily dedicated to parking and entrance foyers. Each residential floor follows a typical layout with four flats arranged around a central core containing two lifts (one designated as a fire lift) and a staircase. The terrace level includes stair cabins, lift machine rooms, and overhead water tanks.
Water, power and access
During the construction phase, water will be sourced from local tankers or the municipal corporation. For the operation phase, the applicant intends to obtain water from the Ahmedabad Municipal Corporation (AMC). To reduce consumption, the project will install low-flow fixtures, including diffused water taps and twin flushing systems.
Power will be supplied by the local utility, with an emergency backup system planned for essential services. The design includes two 6-passenger lifts per block, equipped with automatic grounding features for use during power failures.
Environmental safeguards
The applicant has proposed an Environmental Management Plan (EMP) with a total capital budget of ₹46 lakh.
- Waste Management: Sewage will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 30 KLD (kilolitres per day). Municipal solid waste will be segregated into dry and wet waste; wet waste will be processed in an organic waste composter.
- Water Harvesting: Two percolation wells are planned for groundwater recharge. Stormwater will be directed to the municipal drainage line.
- Greenbelt: The plan includes planting 157 trees within the premises. Topsoil excavated during construction will be stored and reused for greenbelt development.
- Energy Conservation: LED lighting will be used in common areas such as staircases and foyers. Solar lights are proposed for open sunlit areas.
- Air and Noise: During construction, tarpaulin covers and water sprinkling will be used to control dust. Diesel Generator (DG) sets will be equipped with acoustic enclosures to mitigate noise.
Fire and Safety
The project includes a comprehensive fire protection system as per the National Building Code. This includes a hydrant system, automatic sprinklers in the basement, a manual electric fire alarm, and portable extinguishers. An underground water tank of 1,00,000 litres and an overhead tank of 20,000 litres are dedicated to fire safety. A lightning arrester will be installed on the terrace to protect the structure.
Atharva Elanza site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.8 acres, this one is larger than 67% of them.
190 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koba (Og), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shree Ganesh Skyline — environmental approval granted, 50 m away
- Rehvassa Stately — under environmental review, 150 m away
- Rehvassa Stately — environmental approval granted, 150 m away
- Lotus Glorious — environmental approval granted, 200 m away
- Akaay Luxuria — environmental approval granted, 250 m away
- Akaay Luxuria — environmental approval granted, 250 m away
- Shreedhar Sharan — under environmental review, 300 m away
- Elara — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.