Quick answers
What is Lotus Glorious?
Lotus Glorious is an approved mixed-use project in Koba, Gandhinagar, Gujarat. It plans 156 units in 1 tower of up to 20 floors on 1.1 acres.
Who is building it?
The applicant is Maulik Shah.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Jul 2024), as of 27 Nov 2026.
Where is it?
In Koba, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹34.7 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 1 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Jul 2024 |
| Application filed | 1 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maulik Shah |
| Use | Mixed use |
| Units | 156 |
| Towers | 1 |
| Floors (tallest) | 20 |
| Basements | 3 |
| Height | 67 m |
| Parking spaces | 221 |
| Land area | 1.1 acres (0.4 ha) |
| Built-up area | 33,395 m² (3,59,460 sq ft) |
| Plot area | 4,373 m² (47,071 sq ft) |
| Project cost | ₹34.7 crore |
| Village / locality | Koba |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06658 |
What the filings say
What is planned
Lotus Glorious is a mixed-use residential and commercial project proposed by Maulik Shah in Koba, Gandhinagar. The applicant's project report states that the development will consist of two blocks (Block A and B) on a plot of 4,373.00 square metres (1.08 acres). The project is designed with three basement levels, a ground floor, and 20 upper floors, reaching a total proposed built-up area of 33,395.22 square metres.
The residential component comprises 104 units, while the commercial section includes 52 units. The ground floor is dedicated to commercial use, with subsequent floors featuring a mix of residential and commercial spaces. The tallest building is planned for 20 floors above ground level.
| Item | Detail |
|---|---|
| Total Units | 156 (104 Residential, 52 Commercial) |
| Plot Area | 4,373.00 sq. m. (0.44 hectares) |
| Total Built-up Area | 33,395.22 sq. m. |
| Total FSI Area | 17,424.95 sq. m. |
| Tallest Building | 20 Floors |
| Basement Levels | 3 |
| Parking Area | 7,034.68 sq. m. |
| Greenbelt Area | 667.97 sq. m. |
Layout and design
The project layout includes 8.0-metre wide internal approach roads. Entry and exit to the premises are provided through 18.0-metre and 80.0-metre wide Town Planning Scheme (TPS) roads. The design incorporates a common plot of 447.97 square metres.
Parking is distributed across the three basement levels and hollow plinth areas, providing a total of 221 Equivalent Car Spaces (ECS). The applicant has planned for 110 trees within the project site. The building design follows the Gujarat Comprehensive Development Control Regulations (GDCR) and National Building Codes, including specific provisions for non-reflective external facades and cantilever balconies for shading.
Land and surroundings
The project site is located at Final Plot No. 138/2 in Koba, within the limits of the Gandhinagar Municipal Corporation (GMC). The land is currently undeveloped. Soil investigation reports indicate the sub-soil consists of fine sandy clay and silty soil up to a depth of 40 metres. The site is approximately 9.4 km from Ahmedabad airport and 6.55 km from Medra railway station. The project area falls under Seismic Zone III.
Water, power and access
During the operational phase, the total water requirement is estimated at 72.6 kilolitres per day (KLD). Of this, 46.4 KLD will be fresh water sourced from the GMC, while 26.2 KLD will be met through recycled treated sewage. For the construction phase, approximately 9 KLD of water will be supplied via tankers.
Power requirements are estimated at 940 KW, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A single diesel generator set with a capacity of 125 KVA is planned for emergency backup.
Environmental safeguards
The applicant proposes an onsite Sewage Treatment Plant (STP) to treat 58.9 KLD of generated sewage. Treated water will be reused for flushing and gardening, with any surplus discharged into the GMC drainage line. For rainwater management, two percolation wells are planned to recharge groundwater aquifers.
Solid waste management involves a two-bin system for dry and wet waste at the unit level. Total municipal solid waste is estimated at 281 kg per day. Organic waste will be processed in an Organic Waste Convertor, while recyclable materials will be sold to vendors. Fire safety measures include a dedicated water supply tank and a hydrant system, for which a Fire Safety Plan Approval has been obtained.
Lotus Glorious site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 72% of them.
186 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koba, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Akaay Luxuria — environmental approval granted, 50 m away
- Akaay Luxuria — environmental approval granted, 50 m away
- Rehvassa Stately — under environmental review, 100 m away
- Rehvassa Stately — environmental approval granted, 100 m away
- Stately — environmental approval granted, 150 m away
- Avyanna — environmental approval granted, 200 m away
- Atharva Elanza — environmental approval granted, 200 m away
- Shree Ganesh Skyline — environmental approval granted, 200 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.