Quick answers
What is this project?
Proposed project of Methacrylate, Resins, Adhesive, U V Monomer and Acrylates by M/s. Huber Group India Pvt. Ltd is a proposed industrial project in Chhiri, Pardi, Valsad, Gujarat. The site covers 1 acre.
Who is building it?
The applicant is Hubergroup India Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Nov 2022), as of 27 Nov 2026.
Where is it?
In Chhiri, Pardi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹35.6 crore and a site of 1 acre.
When was it filed?
The application was filed on 7 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Methacrylate, Resins, Adhesive, U V Monomer and Acrylates by M/s.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Nov 2022 |
| Application filed | 7 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hubergroup India Private Limited |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹35.6 crore |
| Village / locality | Chhiri |
| Taluk / tehsil | Pardi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00461 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jun 2023 | Environmental approval granted | 1 acre | ₹35.6 crore |
| Early planning filed 7 Nov 2022 (this page) | Cleared for impact study | 1 acre | ₹35.6 crore |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 65% of them.
218 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhiri, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Methacrylate, Resins, Adhesive, U V Monomer and Acrylates… — environmental approval granted, 0 m away
- The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec… — cleared for impact study, 150 m away
- The Proposed Proposal Is for Expansion in Existing Plant Capacity (Non-Ec… — returned to applicant, 150 m away
- Proposed expansion project for the manufacturing of dyes intermediates & API… — environmental approval granted, 150 m away
- Proposed expansion project for the manufacturing of dyes intermediates & API… — cleared for impact study, 150 m away
- EC Amendment for Existing Unit of Organic Pigment Products Manufacturing Unit… — environmental approval granted, 200 m away
- Expansion of Pesticide Technical, Pesticide Intermediates and R & D Products… — environmental approval granted, 250 m away
- Expansion of Pesticide Technical, Pesticide Intermediates and R & D Products… — returned to applicant, 250 m away
More from Hubergroup India Private Limited in Valsad
- Expansion for Manufacturing of Various Resins, Esters, Monomers within… — environmental approval granted
All 3 Hubergroup projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.