Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2023 |
| Application filed | 8 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kodel Lifescience LLP |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹7 crore |
| Village / locality | Pipaliya |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00505 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2023 (this page) | Environmental approval granted | 3.2 acres | ₹7 crore |
| Early planning filed 17 Sept 2022 | Cleared for impact study | 3.2 acres | ₹7 crore |
In context
76 applications in Morbi since January 2022 are in the same category (Industry): 55 approved, 16 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.2 acres, this one is larger than 53% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pipaliya, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Synthetic Organic Chemicals-API and Intermediates — cleared for impact study, 0 m away
- 4-lane Greenfield Highway from Maliya to Pipaliya (missing link of… — cleared for impact study, 5 km away
- Diversion of Protected Forest Land for widening of Morbi - Navlakhi Road… — lapsed, 7 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 7.1 km away
- 4-lane Greenfield Highway from Morbi to Navlakhi Port (connectivity for… — cleared for impact study, 7.6 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — under wildlife review, 7.6 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 7.6 km away
- 4-lane Greenfield Highway form Morbi to Navlakhi (connectivity for Navlakhi… — lapsed, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.