Quick answers
What is Mewasa Bauxite Mining Project, Survey no. 205/P?
Mewasa Bauxite Mining Project, Survey no. 205/P is an approved mining project in Mevasa, Kalyanpur, Devbhumi Dwarka, Gujarat. The site covers 11.3 acres.
Who is building it?
The applicant is M/S Carborundum Universal Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Feb 2023), as of 27 Nov 2026.
Where is it?
In Mevasa, Kalyanpur, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹96 lakh and a site of 11.3 acres.
When was it filed?
The application was filed on 8 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Feb 2023 |
| Application filed | 8 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Carborundum Universal Limited |
| Land area | 11.3 acres (4.6 ha) |
| Project cost | ₹96 lakh |
| Village / locality | Mevasa |
| Taluk / tehsil | Kalyanpur |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00534 |
In context
171 applications in Devbhumi Dwarka since January 2022 are in the same category (Mining): 103 approved, 44 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.3 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Mevasa, Kalyanpur, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mewasa Bauxite Mine — cleared for impact study, 950 m away
- Proposed Virpur Lusari Block - 08 (Area: 4.04.82 ha) for Bauxite (Aluminous… — lapsed, 1.4 km away
- Proposed Mevasa Block - 01 (Auctioned Block) (Area: 7.11.08 ha) with Proposed… — lapsed, 1.7 km away
- Mining project by M/s. Maa Mines And Minerals-(Manipur Habardi Block- 01) — under environmental review, 1.9 km away
- Virpur Lusari Block-03 (Lease Area- 10.8457 Hect.) with Production Capacity… — returned to applicant, 2.4 km away
- Virpur Lusari Block-03 for Bauxite (Aluminous Laterite), Laterite, Limestone &… — withdrawn, 2.4 km away
- Expansion for Mevasa-I Bauxite Mining Project — returned to applicant, 2.4 km away
- Mota Asota Block 4 — environmental approval granted, 2.7 km away
More from M/S Carborundum Universal Limited in Devbhumi Dwarka
- Mahadevia Bauxite Mining Project, Survey No. 241/P of M/S Carborundum… — under environmental review
All 4 Carborundum Universal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.