Quick answers
What is Kailash Luxuria?
Kailash Luxuria is an approved building project in Dindoli, Majura, Surat, Gujarat. The site covers 1.4 acres.
Who is building it?
The applicant is Kailash Corporation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Sept 2023), as of 27 Nov 2026.
Where is it?
In Dindoli, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹41.3 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 16 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Sept 2023 |
| Application filed | 16 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kailash Corporation |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹41.3 crore |
| Village / locality | Dindoli |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00648 |
What the filings say
What is planned
Kailash Corporation proposes to develop a residential and commercial project named Kailash Luxuria in Dindoli, Surat. The project report describes a development consisting of three main building blocks (A&B, C&D, and E&F) with a maximum height of 44.90 metres. The project includes 270 residential units and 33 commercial units (mercantile).
The building configuration is planned as follows:
- Blocks A & B: Ground floor plus 13 floors, with 100 residential units.
- Blocks C & D: Ground floor plus 13 floors, with 86 residential units.
- Blocks E & F: Ground floor plus 14 floors, with 84 residential units.
The project includes two basement levels (1st and 2nd basement) for parking and services. The ground floor is designated for parking and commercial shops. The total built-up area is planned at 38,331.88 square metres, with a total Floor Space Index (FSI) area of 23,308.99 square metres.
Key Figures
| Item | Detail |
|---|---|
| Total Plot Area | 5,828.00 sq. mt. |
| Total Built-up Area | 38,331.88 sq. mt. |
| FSI Area | 23,308.99 sq. mt. |
| Residential Units | 270 |
| Commercial Units | 33 |
| Maximum Floors | G+14 |
| Maximum Height | 44.90 metres |
| Basement Levels | 2 |
Layout and design
The site layout features the three building blocks arranged around a central common plot area of 582.87 square metres. The ground floor plan shows a passage system ranging from 2.22 to 4.16 metres in width. Individual commercial units on the ground floor range from approximately 17.77 to 54.03 square metres in carpet area.
Parking is distributed across the two basements and the ground level. The applicant has proposed a total parking area of 8,502.24 square metres, which includes spaces for 134 four-wheelers. This exceeds the required parking area of 4,310.15 square metres.
Water, power and access
The project site is accessed via a 45-metre wide road and a 30-metre wide road. Internal approach roads within the site are planned to be 6.00 metres wide.
For water management, the applicant proposes a 175 kilolitres per day (KLD) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP). Rainwater harvesting will be managed through a collection system and two percolating recharge wells. An underground water tank with a capacity of 75,000 litres is also planned.
Power backup will be provided by Diesel Generator (DG) sets, which will be housed in acoustic enclosures in the basement to minimize noise. The project also incorporates a rooftop solar system with an 80 KW capacity, requiring 480 square metres of terrace space.
Environmental safeguards
The Environmental Management Plan (EMP) includes a capital expenditure of ₹2.54 crore and a recurring annual cost of ₹19.20 lakh. Key components include:
- Green Belt: A total green area of 900.68 square metres (15.45% of the plot area) is planned, consisting of 317.81 square metres of tree cover and 582.87 square metres of lawn. The applicant intends to plant 150 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
- Waste Management: An automatic Organic Waste Converter (OWC) with a capacity of 450 kg/day will be installed to handle solid waste.
- Air and Noise: Dust mitigation measures will be used during construction. DG sets will be designed to generate less than 75 dB(A) at 0.5 metres from the source.
- Fire Safety: Firefighting systems will be installed as per Surat Municipal Corporation (SMC) opinions, including fire lifts in each building block.
Timeline
The applicant expects the entire project to be completed within approximately four years. The installation of environmental management units is planned to proceed parallel to the construction of the buildings.
Kailash Luxuria site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 55% of them.
49 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dindoli, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Prayosha Jewel — more information requested, 500 m away
- Saffron Sky — environmental approval granted, 550 m away
- Prayosha Gold — environmental approval granted, 650 m away
- Madhav Arista — withdrawn, 750 m away
- Madhav Arista — environmental approval granted, 750 m away
- Prayosha Iconic — environmental approval granted, 900 m away
- Prayosha Crown and Prayosha Classic — environmental approval granted, 1 km away
- Swastik Residency — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.