Cleared for impact studyIndustry · Bhavnagar, Gujarat

Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit (Production Capacity: 107 MT/Month) by M/s. Nigam Pharma LLP

Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit (Production Capacity: 107 MT/Month) by M/s. Nigam Pharma LLP is a proposed industrial project in Kalatalav, Bhavnagar, Gujarat. The site covers 3.4 acres. Its stated project cost is ₹18.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Oct 2023).

See it on the live map All projects in Bhavnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit (Production Capacity: 107 MT/Month) by M/s. Nigam Pharma LLP is a proposed industrial project in Kalatalav, Bhavnagar, Gujarat. The site covers 3.4 acres.

Who is building it?

The applicant is Nigam Pharma LLP.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Oct 2023), as of 27 Nov 2026.

Where is it?

In Kalatalav, Bhavnagar, Gujarat.

How big is it?

It has a stated cost of ₹18.4 crore and a site of 3.4 acres.

When was it filed?

The application was filed on 16 Oct 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit (Production…

Project details

StatusCleared for impact study
Status since16 Oct 2023
Application filed16 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNigam Pharma LLP
Land area3.4 acres (1.4 ha)
Project cost₹18.4 crore
Village / localityKalatalav
Taluk / tehsilBhavnagar
DistrictBhavnagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00661

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Nov 2024Environmental approval granted3.4 acres₹18.4 crore
Early planning filed 16 Oct 2023 (this page)Cleared for impact study3.4 acres₹18.4 crore

In context

34 applications in Bhavnagar since January 2022 are in the same category (Industry): 18 approved, 11 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.4 acres, this one is smaller than 74% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kalatalav, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.