Quick answers
What is this project?
Crz Clearance for Slight Shift on the Land Portion of the Existing Effluent Outfall Pipeline Route of Mspl at Bhavnagar, Gujarat is a lapsed pipeline project in Bhavnagar, Gujarat.
Who is building it?
The applicant is Rameshchandra Vinaychand Shah.
Has it been approved?
No. The application was lapsed on 26 Oct 2026, so it is no longer under consideration.
Where is it?
In Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹20 crore.
When was it filed?
The application was filed on 1 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Oct 2026 |
| Application filed | 1 Jul 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Rameshchandra Vinaychand Shah |
| Project cost | ₹20 crore |
| Village / locality | Bhavnagar |
| Taluk / tehsil | Bhavnagar |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14859 |
In context
19 applications in Bhavnagar since January 2022 are in the same category (Pipelines): 10 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road and Bridge Across the Creek Near Village Ruva — recommended by coastal authority, 2.7 km away
- Environment Clearance for Existing Secondary Metallurgical Industry by M/s.… — environmental approval granted, 4.6 km away
- Environment Clearance for Existing Secondary Metallurgical Industry by M/s.… — cleared for impact study, 4.6 km away
- Himalaya Modern Crest — environmental approval granted, 5.9 km away
- The Golden Empire — environmental approval granted, 6 km away
- Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit… — environmental approval granted, 7 km away
- Proposed Bulk Drugs and Active Pharmaceutical Ingredient Manufacturing Unit… — cleared for impact study, 7 km away
- Nirma Limited, Bhavnagar — initial checks, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.