Quick answers
What is Single Point Mooring & Associated Infrastructure?
Single Point Mooring & Associated Infrastructure is an approved port and coastal project in Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat.
Who is building it?
The applicant is Coviva Energy Terminals Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Dec 2024), as of 27 Nov 2026.
Where is it?
In Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹500 crore.
When was it filed?
The application was filed on 12 Jul 2024.
Project details
| Official title | Proposed Installation of Single Point Mooring & Associated Infrastructure at Vadinar Taluka Khambhalia District Devbhumi Dwarka by M/s Coviva Energy Terminals Limited (a subsidiary of Nayara Energy Limited) |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Dec 2024 |
| Application filed | 12 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Coviva Energy Terminals Limited |
| Project cost | ₹500 crore |
| Village / locality | Vadinar |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00721 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Aug 2024 | Lapsed | ₹500 crore | |
| New project filed 12 Jul 2024 (this page) | Environmental approval granted | ₹500 crore |
In context
16 applications in Devbhumi Dwarka since January 2022 are in the same category (Ports & coast): 3 approved, 11 filed or under review, and 2 withdrawn, lapsed or rejected.
Where it is
Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Single Point Mooring & Associated Infrastructure — lapsed, 0 m away
- Re-CRZ Clearance for development of Outfitting Jetty & Floating Dry Dock… — lapsed, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — under wildlife review, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — more information requested, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — lapsed, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — more information requested, 7 km away