Quick answers
What is Single Point Mooring & Associated Infrastructure?
Single Point Mooring & Associated Infrastructure is a lapsed project in Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat.
Who is building it?
The applicant is Coviva Energy Terminals Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹500 crore.
When was it filed?
The application was filed on 14 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Single Point Mooring & Associated Infrastructure
Project details
| Official title | Proposed Installation of Single Point Mooring & Associated Infrastructure at Vadinar Taluka Khambhalia District Devbhumi Dwarka by M/s Coviva Energy Terminals Limited (a subsidiary of Nayara Energy Limited) |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 14 Aug 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Coviva Energy Terminals Limited |
| Project cost | ₹500 crore |
| Village / locality | Vadinar |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14912 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Aug 2024 (this page) | Lapsed | ₹500 crore | |
| New project filed 12 Jul 2024 | Environmental approval granted | ₹500 crore |
In context
6 applications in Devbhumi Dwarka since January 2022 are in the same category (Other): 1 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Vadinar, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Single Point Mooring & Associated Infrastructure — environmental approval granted, 0 m away
- Re-CRZ Clearance for development of Outfitting Jetty & Floating Dry Dock… — lapsed, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — under wildlife review, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 7 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — more information requested, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — lapsed, 7 km away
- Re-CRZ clearance for development of Out Fitting Jetty and Floating Dry-dock… — more information requested, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.