One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Building and Construction Project at R.S Nos. 108/B, 111/B, 112/B and CS…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Sept 2023 |
| Application filed | 23 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Neptune Infraspace PVT. LTD. |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹32.8 crore |
| Village / locality | Subhanpura |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00794 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 23 Jul 2024 | Environmental approval granted | 7.4 acres | ₹32.8 crore |
| Early planning filed 23 Sept 2023 (this page) | Cleared for impact study | 7.4 acres | ₹32.8 crore |
In context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is larger than 78% of them.
61 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Subhanpura, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Building and Construction Project at R.S Nos. 108/B, 111/B, 112/B… — environmental approval granted, 0 m away
- Pacifica One — environmental approval granted, 350 m away
- Design Modification of "Neptune Obelisk and Neptune City Centre" in Neptune… — environmental approval granted, 400 m away
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — more information requested, 500 m away
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — withdrawn, 500 m away
- Proposed Construction of Commercial Buildings and MLCP — initial checks, 700 m away
- Addition of Construction activity at Alembic City West (Phase III) — environmental approval granted, 800 m away
- Addition of Construction activity at Alembic city West (Phase II) — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.