Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 12 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Shreno Limited |
| Use | Mixed use |
| Units | 307 |
| Towers | 20 |
| Floors (tallest) | 11 |
| Basements | 2 |
| Height | 44 m |
| Parking spaces | 1,093 |
| Land area | 49.7 acres (20.1 ha) |
| Built-up area | 1,40,448 m² (15,11,768 sq ft) |
| Plot area | 2,04,509 m² (22,01,314 sq ft) |
| Project cost | ₹227 crore |
| Village / locality | Gorva |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05438 |
What the filings say
What is planned
Shreno Limited and Alembic Limited propose an expansion of the Alembic City West (Phase III) township in Gorva, Vadodara. The project involves the addition of a new commercial building to the existing residential development. The existing project is currently in the construction phase.
The expansion specifically adds a commercial office building with a total proposed built-up area of 21,775.54 square metres. The building is designed to accommodate an estimated peak population of 1,200 office workers, 10 security personnel, and various visitors.
| Item | Detail |
|---|---|
| Total Plot Area | 2,00,955.69 square metres |
| Existing Built-up Area | 1,18,672.26 square metres |
| Proposed Built-up Area (Expansion) | 21,775.54 square metres |
| Total Built-up Area after Expansion | 1,40,447.8 square metres |
| Proposed Office Population | 1,200 persons |
| Proposed STP Capacity | 40 kilolitres per day (kld) |
| Total STP Capacity after Expansion | 355 kld |
| Total Solid Waste after Expansion | 1,135 kg/day |
Layout and design
The project site is located at City Survey numbers 2561 and 2558. The layout includes dedicated zones for residential areas, a club house, commercial sheds, and the new office building. The design incorporates energy efficiency measures such as the use of Autoclaved Aerated Concrete (AAC) for walls and ceilings to provide better insulation and thermal mass.
External lighting will utilize LED fixtures, and solar photovoltaic (PV) panels with an 8 KW capacity are proposed to generate electricity, aiming to save approximately 9% of energy after the expansion. The building shell is designed to reflect solar insulation to reduce air conditioning loads.
Land and surroundings
The project is situated on Alembic Road in Vadodara. The total landscape area for the township after expansion will be 30,509.08 square metres (approximately 7.54 acres), representing 15.2% of the plot area. The applicant plans to maintain a total of 3,020 trees on the site, which includes 750 existing trees and 2,270 newly proposed trees. Species planned for plantation include Saptaparni, Neem, Badam, Gulmohar, and Pride of India.
Water, power and access
During the construction phase, approximately 125 kld of water will be sourced from the Vadodara Municipal Corporation (VMC). For the operational phase of the new commercial building, the total water requirement is estimated at 56.3 kld, of which 30.9 kld will be fresh water and 25.4 kld will be recycled water.
Sewage from the new building (50.1 kld) will be treated in a proposed 40 kld Sewage Treatment Plant (STP) using Moving Bed Bio Reactor (MBBR) technology. After expansion, the total sewage generation for the entire township is projected at 312 kld, to be treated by a combined STP capacity of 355 kld. Treated water will be reused for flushing, horticulture, and dust suppression.
Stormwater management includes the installation of two rainwater harvesting percolation wells for the new construction. Access to the site is provided via the existing 36-metre wide Gorva Road.
Environmental safeguards
The applicant has outlined an Environment Management Plan (EMP) to mitigate impacts during both construction and operation:
- Air Quality: Dust suppression through water sprinkling, barricading, and ensuring all construction vehicles have valid Pollution Under Control (PUC) certificates.
- Noise: Use of silent Diesel Generator (DG) sets and providing personal protective equipment (PPE) like ear muffs to workers in high-noise areas.
- Waste Management: Segregation of waste at source. Biodegradable waste (estimated at 568 kg/day for the whole site) will be composted on-site, while non-biodegradable and inert waste will be sent to municipal disposal sites.
- Vibration: Proper maintenance and balanced foundations for machinery like pumps and DG sets to eliminate mechanical vibrations.
Addition of Construction Activity at Alembic City West (Phase III) site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 49.7 acres, this one is larger than 96% of them.
63 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gorva, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Addition of Construction activity at Alembic city West (Phase II) — environmental approval granted, 0 m away
- Addition of Construction activity at Alembic City West (Final Phase) — more information requested, 0 m away
- Addition of Construction activity at Alembic City West (Final Phase) — cleared for impact study, 0 m away
- Expansion of Building and Construction Project at R.S Nos. 108/B, 111/B, 112/B… — environmental approval granted, 800 m away
- Expansion of Building and Construction Project at R.S Nos. 108/B, 111/B, 112/B… — cleared for impact study, 800 m away
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — more information requested, 800 m away
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — withdrawn, 800 m away
- Proposed Construction of Commercial Buildings and MLCP — initial checks, 850 m away
More from Shreno Limited in Vadodara
- Addition of Construction activity at Alembic City West (Final Phase) — more information requested
- Addition of Construction activity at Alembic City West (Final Phase) — cleared for impact study
- Addition of Construction activity at Alembic city West (Phase II) — environmental approval granted
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — withdrawn
5 Shreno projects in Vadodara
All 7 Shreno projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.