Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2023 |
| Application filed | 6 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Om Corporation |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹3.7 crore |
| Village / locality | Nikol |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00865 |
What the filings say
What is planned
OM Corporation proposes to develop a residential project named Kalhar Wing in Nikol, Ahmadabad. According to the applicant's layout plans, the project consists of three residential blocks (Block A, B, and C) with a maximum height of 13 floors above ground level. The development includes a basement for parking and a hollow plinth at the ground level also dedicated to parking.
The project is planned on a plot area of 4,517.48 square metres. The built-up area statement indicates a total built-up area of 23,077.39 square metres. The residential component is distributed as follows:
- Block A: 24 residential units across 13 floors.
- Block B: 24 residential units across 13 floors.
- Block C: 24 residential units across 13 floors.
In total, the project will provide 72 residential units. Each block is equipped with two lifts, including one designated as a fire lift with a 10-person capacity.
Layout and design
The layout features a central common plot area of 824.90 square metres, which exceeds the required 10% of the net plot area (451.75 square metres). Access to the site is provided by an 18.0-metre wide T.P.S. road. Internal movement is facilitated by 6.0-metre wide approach roads and 3.37-metre wide pathways.
The residential units are designed as large apartments. Typical floor plans for Blocks A and C show units with a RERA carpet area of approximately 170.71 square metres, while Block B units are approximately 173.56 square metres. The 12th and 13th floors feature different configurations with open terraces.
| Item | Detail |
|---|---|
| Total Plot Area | 4,517.48 square metres |
| Total Built-up Area | 23,077.39 square metres |
| Total Residential Units | 72 |
| Maximum Floors | Basement + Ground + 13 Floors |
| Common Plot Area | 824.90 square metres |
| Proposed Trees | 113 |
| Underground Water Tank | 1,00,000 litres |
| Overhead Water Tank | 20,000 litres |
Water, power and access
The project report states that water for construction will be managed using conservation techniques such as chemical curing and gunny bag covering to reduce demand. During the operation phase, roof-top rain water will be collected in a Reinforced Cement Concrete (RCC) tank for gardening and firefighting.
Sewage will be treated in a proposed Sewage Treatment Plant (STP). The treated water will be reused for flushing and gardening within the premises, with the surplus discharged into the Ahmadabad Municipal Corporation (AMC) drainage line. Power will be sourced from the local utility, with a Diesel Generator (DG) set provided for emergency backup in case of power failure.
Environmental safeguards
The applicant has filed an Environmental Management Plan (EMP) detailing several mitigation measures:
- Air Quality: Water sprinkling will be used for dust suppression during construction. The site boundary will be barricaded with 15-foot high sheets. Vehicles must have valid Pollution Under Control (PUC) certificates and adhere to a speed limit of less than 20 kmph.
- Noise Control: Construction activities will be restricted to daytime. Anti-vibration pads will be used for machinery, and the DG set will be housed in an acoustic enclosure.
- Waste Management: Solid waste will be segregated at source. Organic waste will be treated within the premises using an Organic Waste Converter (OWC), while recyclable materials will be disposed of as per municipal practices.
- Greenbelt: A greenbelt will be developed within the premises, with 113 trees planned to provide noise attenuation and local ecological support.
- Rainwater Harvesting: Two percolation wells are proposed to assist in groundwater recharge.
Kalhar Wing site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 77% of them.
210 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ganesh Rivera — environmental approval granted, 250 m away
- Nest Richmond — lapsed, 400 m away
- Nest Richmond — environmental approval granted, 400 m away
- Raj mahal & the Lake Palace — environmental approval granted, 400 m away
- Rajmahal & The Fun Mall — environmental approval granted, 400 m away
- Rajmahal & The Fun Mall — environmental approval granted, 400 m away
- Rajmahal & The Fun Mall — lapsed, 400 m away
- Rajmahal & The Fun Mall — environmental approval granted, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.