One of 2 filings for this project. The project's main page, with every filing and where each stands: Nest Richmond
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Dec 2025 |
| Application filed | 19 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Giriraj Corporation |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹115.4 crore |
| Village / locality | Nikol |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05301 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 19 Jul 2024 (this page) | Lapsed | 1.9 acres | ₹115.4 crore |
| New project filed 21 Apr 2024 | Environmental approval granted | 1.9 acres | ₹115.4 crore |
What the filings say
What is planned
The applicant, Giriraj Corporation, proposes the construction of "Nest Richmond," a mixed-use residential and commercial development in Nikol, Ahmedabad. The project report describes a complex consisting of five blocks (A, B, C, D, and E) with two basement levels for parking.
According to the environmental clearance, the project will provide 236 residential flats and 32 commercial units. The building configurations are planned as follows:
- Blocks A, B, C, and E: 2 Basements + Ground Floor + 13 Floors.
- Block D: 2 Basements + Ground Floor + 4 Floors.
The total built-up area is specified as 52,836.66 square metres, with a Floor Space Index (FSI) area of 31,967.93 square metres on a plot of 7,466 square metres (1.84 acres).
| Item | Detail |
|---|---|
| Residential Units | 236 flats |
| Commercial Units | 32 showrooms/shops |
| Total Built-up Area | 52,836.66 sq. m |
| FSI Area | 31,967.93 sq. m |
| Total Parking Space | 422 cars (13,312.87 sq. m) |
| STP Capacity | 175 KLD |
| Solar Power Generation | 138 KW |
Layout and design
The ground floor of Blocks A and B is designed to house 19 and 13 showrooms respectively, while the upper floors are dedicated to residential use. The layout includes a common plot area of 746.76 square metres. Access to the site is provided via a 24-metre wide and a 12-metre wide Town Planning Scheme (TPS) road.
Internal movement is supported by multiple staircases and lifts. Blocks A+B will have two staircases and four lifts (including two fire lifts), while Blocks C, D, and E will each have one staircase and two lifts (including one fire lift). The basements are designed with a height of over 4.5 metres to accommodate potential mechanical parking systems in the future.
Water, power and access
The project's total water requirement during the operation phase is estimated at 172.8 kilolitres per day (KLD). Of this, 110.3 KLD of fresh water will be sourced from the Ahmedabad Municipal Corporation (AMC), and 62.5 KLD will be met through treated sewage.
A Sewage Treatment Plant (STP) with a capacity of 175 KLD will be installed on-site. Treated wastewater will be reused for flushing and gardening via a dual plumbing system. For power backup, a 125 KVA diesel generator set with an acoustic enclosure is proposed. Energy conservation measures include the installation of solar street lights and a 138 KW solar power generation system.
Environmental safeguards
The applicant plans to develop a green belt covering 1,393.64 square metres, which represents approximately 18.6% of the plot area. This includes a tree-covered area of 448.8 square metres with 187 trees.
Solid waste management involves source segregation into dry and wet waste. An on-site Organic Waste Converter (OWC) will treat biodegradable waste. For rainwater management, the project includes two percolation wells for groundwater recharge and an RCC tank for collecting rooftop runoff to be used for gardening and firefighting.
Corporate Environmental Responsibility
The applicant has committed ₹241.5 lakhs toward Corporate Environmental Responsibility (CER) activities to be completed within three years. Planned initiatives include:
- Installation of 158 solar panels (500W each) at Bhuvaldi Gram Panchayat, Bharkunda Village, and local primary schools.
- Distribution of organic waste converters and waste bins in Zanu and Bhuvaldi villages.
- Construction of four rainwater harvesting structures.
- Plantation of 315 trees with protective guards.
Nest Richmond site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 61% of them.
213 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nest Richmond — environmental approval granted, 50 m away
- The Grand Serenity — environmental approval granted, 150 m away
- Building project by 'LIG House under PMAY' of Ahmedabad Municipal Corporation — lapsed, 250 m away
- Building project by 'LIG House under PMAY' of Ahmedabad Municipal Corporation — environmental approval granted, 250 m away
- Building project by 'LIG House under PMAY' of Ahmedabad Municipal Corporation — environmental approval granted, 250 m away
- Velorum Sky — environmental approval granted, 300 m away
- Hindva Luxuria — under environmental review, 350 m away
- Kalhar Wing — environmental approval granted, 400 m away