Quick answers
What is this project?
EC Transfer for Kadaya Limestone Mine in Survey No. 42/P admeasuring 9.8743 hectares is a proposed mining project in Kadaya, Malia Hatina, Junagadh, Gujarat. The site covers 24.4 acres.
Who is building it?
The applicant is Ghcl Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In Kadaya, Malia Hatina, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹17 lakh and a site of 24.4 acres.
When was it filed?
The application was filed on 14 Apr 2023.
Project details
| Official title | EC Transfer for Kadaya Limestone Mine in Survey No. 42/P admeasuring 9.8743 hectares in Village Kadaya Taluka Maliya dist. Junagadh Gujarat |
|---|---|
| Status | Application filed |
| Status since | 14 Apr 2023 |
| Application filed | 14 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Ghcl Limited |
| Land area | 24.4 acres (9.9 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Kadaya |
| Taluk / tehsil | Malia Hatina |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00994 |
In context
255 applications in Junagadh since January 2022 are in the same category (Mining): 145 approved, 43 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 24.4 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Kadaya, Malia Hatina, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s GHCL Limited. Production Expansion — environmental approval granted, 50 m away
- M/s GHCL Limited. Production Expansion — cleared for impact study, 50 m away
- Shri Nagdanbhai Mulubhai Sisodiya — environmental approval granted, 700 m away
- Shri Nagdanbhai Mulubhai Sisodiya — cleared for impact study, 700 m away
- Shri Kanabhai Arjanbhai Vala — environmental approval granted, 1.4 km away
- Vala Kanabhai Arjanbhai — withdrawn, 1.4 km away
- M/s GHCL Limited. Production Expansion — environmental approval granted, 4.3 km away
- M/s GHCL Limited. Production Expansion — cleared for impact study, 4.3 km away
More from Ghcl Limited in Junagadh
- M/s GHCL Limited. Production Expansion — environmental approval granted
- M/s GHCL Limited. Production Expansion — environmental approval granted
- M/s GHCL Limited. Production Expansion — cleared for impact study
- M/s GHCL Limited. Production Expansion — cleared for impact study
- EC Transfer for Bhanduri Limestone Mine in Survey No. 481 admeasuring 24.2811… — under environmental review
- EC Transfer for Bhanduri Limestone Mine in Survey No. 119 admeasuring 8.4682… — under environmental review
8 Ghcl projects in Junagadh
All 10 Ghcl projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.