Quick answers
What is M/s GHCL Limited. Production Expansion?
M/s GHCL Limited. Production Expansion is a proposed mining project in Kadaya, Malia Hatina, Junagadh, Gujarat. The site covers 24.4 acres.
Who is building it?
The applicant is Ghcl Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Jun 2025), as of 27 Nov 2026.
Where is it?
In Kadaya, Malia Hatina, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹5.9 crore and a site of 24.4 acres.
When was it filed?
The application was filed on 28 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: M/s GHCL Limited. Production Expansion
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Jun 2025 |
| Application filed | 28 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ghcl Limited |
| Land area | 24.4 acres (9.9 ha) |
| Project cost | ₹5.9 crore |
| Village / locality | Kadaya |
| Taluk / tehsil | Malia Hatina |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09103 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 28 Nov 2025 | Environmental approval granted | 24.4 acres | ₹5.9 crore |
| Early planning filed 28 Feb 2025 (this page) | Cleared for impact study | 24.4 acres | ₹5.9 crore |
In context
255 applications in Junagadh since January 2022 are in the same category (Mining): 145 approved, 43 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 24.4 acres, this one is larger than 94% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 48.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Kadaya, Malia Hatina, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s GHCL Limited. Production Expansion — environmental approval granted, 0 m away
- EC Transfer for Kadaya Limestone Mine in Survey No. 42/P admeasuring 9.8743… — application filed, 50 m away
- Shri Nagdanbhai Mulubhai Sisodiya — environmental approval granted, 750 m away
- Shri Nagdanbhai Mulubhai Sisodiya — cleared for impact study, 750 m away
- Shri Kanabhai Arjanbhai Vala — environmental approval granted, 1.4 km away
- Vala Kanabhai Arjanbhai — withdrawn, 1.4 km away
- M/s GHCL Limited. Production Expansion — environmental approval granted, 4.3 km away
- M/s GHCL Limited. Production Expansion — cleared for impact study, 4.3 km away
More from Ghcl Limited in Junagadh
- M/s GHCL Limited. Production Expansion — environmental approval granted
- M/s GHCL Limited. Production Expansion — cleared for impact study
- EC Transfer for Bhanduri Limestone Mine in Survey No. 481 admeasuring 24.2811… — under environmental review
- EC Transfer for Bhanduri Limestone Mine in Survey No. 119 admeasuring 8.4682… — under environmental review
- EC Transfer for Bhanduri Limestone Mine in Survey No. 57 admeasuring 10.6938… — under environmental review
- EC Transfer for Kadaya Limestone Mine in Survey No. 42/P admeasuring 9.8743… — application filed
8 Ghcl projects in Junagadh
All 10 Ghcl projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.