Quick answers
What is The Boulevard Homes?
The Boulevard Homes is an approved building project in Dumas, Majura, Surat, Gujarat. The site covers 1.4 acres.
Who is building it?
The applicant is Pink Stone Realty LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jan 2023), as of 27 Nov 2026.
Where is it?
In Dumas, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹40.4 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 24 Jan 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Pink Stone Realty LLP |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹40.4 crore |
| Village / locality | Dumas |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01001 |
What the filings say
What is planned
Pink Stone Realty LLP has proposed a residential building project named "The Boulevard Homes" in Dumas, Surat. According to the applicant's conceptual plan, the project will consist of three residential buildings, each rising to 11 floors above two basement levels and a hollow plinth. The development is planned to house a total of 64 residential units.
In addition to the residential units, the project includes several infrastructural features for residents:
- A clubhouse for the society
- A garden with a jogging park
- A dedicated children's play area
- A wellness area and indoor games facility
- A gymnasium
The total built-up area for the project is 28,684.83 square metres, with a floor space index (FSI) area of 15,755.90 square metres.
Layout and design
The site layout features three distinct building blocks (A, B, and C). The ground floor of these blocks will accommodate common amenities such as the banquet hall, gymnasium, and indoor games area. The residential units are distributed across the upper floors, with typical floor plans showing spacious layouts including foyers, decks, and multiple bedrooms with attached toilets.
Vertical circulation is provided through two lifts and one fire lift per building. The buildings are designed with a maximum height of 41.02 metres. For parking, the applicant has proposed a total of 222 Equivalent Car Spaces (ECS), distributed across the basement (201 ECS), hollow plinth (19 ECS), and surface area (2 ECS).
Land and surroundings
The project is situated on a plot of 0.58 hectares (1.44 acres) at Dumas in the Majura sub-district of Surat. The site is located approximately 2.51 km from Surat Airport and 15.66 km from the Surat railway station. The applicant states that the land is private residential land and that no national parks, wildlife sanctuaries, or ecologically sensitive areas fall within a 10 km radius of the site.
Water, power and access
Water for the project will be supplied by the Surat Municipal Corporation (SMC). The total water requirement during the operational phase is estimated at 48 kilolitres per day (KLD), with a fresh water requirement of 27 KLD. The remaining 21 KLD will be met through recycled treated water for flushing (18 KLD) and gardening (3 KLD).
Power will be sourced from the Dakshin Gujarat Vij Company Limited (DGVCL), with a maximum demand of 350 KW. For emergency backup, the applicant proposes to install one silent diesel generator set of 125 KVA capacity. Solar power generation with a capacity of 40 KW is also planned for common area lighting.
Access to the site is provided via two entry and exit gates from a 24-metre wide Development Plan (DP) road.
Environmental safeguards
The project includes a sewage treatment plant (STP) with a capacity of 50 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated sewage will be reused for flushing and landscaping, with any excess (estimated at 15 KLD) discharged into the SMC drainage line.
For solid waste management, an organic waste converter with a capacity of 60 kg per day will be installed to process wet waste into manure for use on-site. Inorganic and recyclable waste will be collected and handed over to the SMC waste collection system.
Rainwater harvesting will be implemented through two recharge wells. The green belt development plan includes planting 95 trees, covering a total green area of 600 square metres (approximately 10.25% of the plot area).
The Boulevard Homes site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 55% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dumas, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mangalam Bliss — environmental approval granted, 300 m away
- High Rise Residential Building at Block NO. - 653, T.P.NO - 77… — environmental approval granted, 500 m away
- Residential Building Project by Jagamal Bhatu — environmental approval granted, 550 m away
- "residential Cum Commercial Project" by Mr. Manojbhai A. Gandhi — environmental approval granted, 600 m away
- Vacanza Aurum — environmental approval granted, 800 m away
- Avadh Onella — environmental approval granted, 850 m away
- Building project by M/s. Palacio Realty LLP — environmental approval granted, 1.1 km away
- Sangini Lakewoods — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.