What is Reliance Syngas Limited – 332 MW Captive Power Plant?
Reliance Syngas Limited – 332 MW Captive Power Plant is a proposed power project in Kanalus, Lalpur, Jamnagar, Gujarat. The site covers 687 acres.
Who is building it?
The applicant is Reliance Syngas Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Jul 2023), as of 27 Nov 2026.
Where is it?
In Kanalus, Lalpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹900 crore and a site of 687 acres.
When was it filed?
The application was filed on 6 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Reliance Syngas Limited – 332 MW Captive Power Plant
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Jul 2023 |
| Application filed | 6 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Reliance Syngas Limited |
| Land area | 687 acres (278 ha) |
| Project cost | ₹900 crore |
| Village / locality | Kanalus |
| Taluk / tehsil | Lalpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01093 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Feb 2024 | Environmental approval granted | 687 acres | ₹900 crore |
| Early planning filed 6 May 2023 (this page) | Cleared for impact study | 687 acres | ₹900 crore |
In context
30 applications in Jamnagar since January 2022 are in the same category (Power): 9 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 687 acres, this one is larger than 85% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanalus, Lalpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Nayara Energy Seeks to Amend Clearance for its 60-Million-Tonne Refinery Expansion in Gujarat (12.9 km away).
Other projects nearby
- Reliance Syngas Limited – 332 MW Captive Power Plant — environmental approval granted, 0 m away
- Reliance Syngas Limited – Amendment in Ec to Add Coal and Biomass As Feed to… — environmental approval granted, 0 m away
- Shri Jitendra Maldebhai Bhutiya — environmental approval granted, 2.6 km away
- Shri Devshibhai Chavada — environmental approval granted, 3.9 km away
- Shri Lakhmanbhai Meragbhai Kanbaria (Re-Appraisal) Lease Area-1.00.00Ha. Vill:… — environmental approval granted, 4.2 km away
- Reliance Industries Limited – Amendment in EC for higher production capacity… — withdrawn, 4.5 km away
- Transfer of EC No. EC23A1004GJ5494809N, dated 19-10-2024 granted to Reliance… — environmental approval granted, 4.7 km away
- Reliance New Solar Energy Limited - Metallurgical Grade Silicon (100 KTA),… — environmental approval granted, 4.7 km away
More from Reliance Syngas Limited in Jamnagar
- Reliance Syngas Limited – Amendment in Ec to Add Coal and Biomass As Feed to… — environmental approval granted
All 3 Reliance Syngas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.