| Status | Environmental approval granted |
|---|---|
| Status since | 7 Nov 2023 |
| Application filed | 7 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Umiya Developers |
| Land area | 3,800 m² |
| Project cost | ₹29.5 crore |
| Village / locality | Nikol |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01169 |
What the filings say
What is planned
Umiya Developers proposes a residential affordable housing project named Sawera Shaligram in Nikol, Ahmadabad. According to the applicant's project reports, the development will consist of four residential blocks, designated as Blocks A, B, C, and D.
The project is designed to accommodate 160 residential units. The buildings are planned to reach a height of 32.90 metres, with a total height of 39.02 metres including the machine room and overhead water tank. The structure comprises two basement levels for parking, a hollow plinth (ground floor) for additional parking and entrance foyers, and 10 residential floors above.
Project Specifications
| Item | Detail |
|---|---|
| Total Residential Units | 160 |
| Number of Blocks | 4 (A, B, C, D) |
| Building Height | 32.90 m (to top floor) |
| Total Floors | 2 Basements + Ground + 10 Floors |
| Total Built-up Area | 22,334.65 sq. m |
| Total Utilised FSI | 11,659.20 sq. m |
| Proposed Tree Plantation | 95 trees |
Layout and design
The layout plan shows the four blocks arranged around a central common plot area. The common plot is divided into three sections (A, B, and C) totaling 378.27 square metres. Each block is served by two lifts, including one designated as a fire lift.
Parking is distributed across two basement levels and the ground floor hollow plinth. Access to the basements is provided via two 6.00-metre wide ramps with a 1:7 slope. The ground floor includes entrance foyers for each block and an electrical substation (Ele. S.S.) measuring 7.39 square metres.
Environmental safeguards
The applicant has outlined an Environment Management Plan with a total capital cost of ₹239.25 lakhs. Key features include:
- Water Management: A 125 KLD (kilolitres per day) Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant is proposed. For rainwater harvesting, one percolation well is planned.
- Waste Management: Solid waste is estimated at 160 kg per day, to be managed using an automatic Organic Waste Converter (OWC).
- Energy: The project includes the installation of a 75 KW rooftop solar energy system at the terrace space and LED lighting in common areas.
- Green Belt: A green belt of 95 trees and lawn areas will be developed over 378.27 square metres.
- Pollution Control: During construction, dust mitigation measures such as water sprinkling and wind-breaking walls will be used. Diesel Generator (DG) sets will be equipped with acoustic enclosures and stacks.
Water, power and access
The project site is accessed via a 6.00-metre wide approach road. Water supply for fire fighting and domestic use will be supported by an underground water tank with a 1,00,000-litre capacity and overhead tanks of 20,000 litres. Fire safety systems include a hydrant system, fire alarm call points on each floor, and extinguishers (CO2 and DCP types).
Timeline
The applicant has scheduled Corporate Environmental Responsibility (CER) activities over a three-year period from 2024 to 2027. These include setting up a drinking water R.O. plant at Kathwada (2024-25), providing solar panels for public health centres and schools in Naroda and Bapunagar (2025-26), and installing energy-efficient LED bulbs in nearby public places (2026-27).
Sawera Shaligram site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.9 acres, this one is smaller than 88% of them.
277 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Royal Rudraksha — environmental approval granted, 250 m away
- Shivay Lavis — environmental approval granted, 250 m away
- Radhika Royal — environmental approval granted, 250 m away
- Gulmohar Empire — environmental approval granted, 300 m away
- Yashvi Landmark — environmental approval granted, 400 m away
- Effiel Towers — environmental approval granted, 450 m away
- Effiel Towers — environmental approval granted, 450 m away
- Effiel Towers — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.