Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Royal Rudraksha

Royal Rudraksha is an approved building project in Nikol, Sabarmati, Ahmadabad, Gujarat. The site covers 1.6 acres. Its stated project cost is ₹40.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 25 Mar 2023).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since25 Mar 2023
Application filed25 Mar 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantKingston Infrastructure
Land area1.6 acres (0.6 ha)
Project cost₹40.5 crore
Village / localityNikol
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-02302

What the filings say

What is planned

Royal Rudraksha is a residential and commercial development proposed by Kingston Infrastructure. The applicant's project report describes a complex consisting of four blocks (A, B, C, and D) with a maximum height of 13 floors.

The project includes 108 residential units and 47 commercial units (shops and offices). The built-up area statement indicates a total built-up area of 30,958.04 square metres, with a total utilized Floor Space Index (FSI) of 16,677.41 square metres.

Building Configuration

Layout and design

The site layout features a central common plot of 629.44 square metres. Internal roads are designed to be 6.00 metres wide to facilitate smooth traffic movement. The project includes separate entry and exit points along the 12.00-metre and 30.00-metre wide Town Planning Scheme (TPS) roads.

Parking is distributed across the two cellar levels and ground-level visitor parking areas. Specific visitor parking zones are designated with areas ranging from 46.00 square metres to 129.00 square metres. The design incorporates a dedicated substation, a Sewage Treatment Plant (STP) of 31.00 square metres, and an Organic Waste Converter (OWC) area of 42.00 square metres.

Water, power and access

According to the Environmental Management Plan (EMP), the project will generate approximately 100 kilolitres per day (KLD) of sewage, which will be treated in an on-site STP. Treated water will be reused for gardening and flushing, with the surplus discharged into the Ahmedabad Municipal Corporation (AMC) drainage line.

For power, the applicant proposes a rooftop solar system with a capacity of 120 KW, requiring approximately 1,200.00 square metres of terrace space. Diesel Generator (DG) sets with acoustic enclosures will be provided for emergency backup. Rainwater harvesting will be managed through two percolating wells to recharge the groundwater.

Environmental safeguards

The applicant has allocated a capital budget of ‡2.54 crore for environmental management. A greenbelt covering 910.44 square metres (14.56% of the plot area) is planned, consisting of a 629.44 square metre lawn and a 281.00 square metre tree plantation area. The plantation program includes 157 trees of species such as Asopalav, Neem, Gulmohar, and Pipal.

Solid waste management involves source segregation. Organic waste will be treated using an automatic OWC with a capacity of 191 kg/day. For fire safety, the project will install wet risers, fire alarms, extinguishers, and a booster pump as per municipal regulations.

Corporate Environment Responsibility

The applicant has proposed a budget of ‡82.00 lakh (2% of the project cost) for Corporate Environment Responsibility (CER) activities over three years. These activities are targeted at the nearby villages of Raipur, Bhuvaladi, and Zanu, and include:

ItemDetail
Total Built-up Area30,958.04 sq. m.
Residential Units108
Commercial Units47
STP Capacity100 KLD
Solar Power Capacity120 KW
Greenbelt Area910.44 sq. m.
Total Trees Planned157
CER Budget‡82.00 lakh

Royal Rudraksha site plan and layout

A drawing from the project's filings. Sign in free to see it.

Royal Rudraksha: Layout plan: building blocks, common plot, parking, and internal roads (preview)🔒 Sign in free to see it
Layout plan: building blocks, common plot, parking, and internal roads

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is smaller than 51% of them.

268 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.