Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Mar 2023 |
| Application filed | 25 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kingston Infrastructure |
| Land area | 1.6 acres (0.6 ha) |
| Project cost | ₹40.5 crore |
| Village / locality | Nikol |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02302 |
What the filings say
What is planned
Royal Rudraksha is a residential and commercial development proposed by Kingston Infrastructure. The applicant's project report describes a complex consisting of four blocks (A, B, C, and D) with a maximum height of 13 floors.
The project includes 108 residential units and 47 commercial units (shops and offices). The built-up area statement indicates a total built-up area of 30,958.04 square metres, with a total utilized Floor Space Index (FSI) of 16,677.41 square metres.
Building Configuration
- Blocks A & B: Residential units from the 2nd to 13th floors.
- Block C: Residential units from the 2nd to 13th floors.
- Block D: Residential units from the 2nd to 13th floors.
- Commercial: Shops and offices are planned for the ground and first floors.
- Basements: Two levels of cellars are planned for parking and services.
Layout and design
The site layout features a central common plot of 629.44 square metres. Internal roads are designed to be 6.00 metres wide to facilitate smooth traffic movement. The project includes separate entry and exit points along the 12.00-metre and 30.00-metre wide Town Planning Scheme (TPS) roads.
Parking is distributed across the two cellar levels and ground-level visitor parking areas. Specific visitor parking zones are designated with areas ranging from 46.00 square metres to 129.00 square metres. The design incorporates a dedicated substation, a Sewage Treatment Plant (STP) of 31.00 square metres, and an Organic Waste Converter (OWC) area of 42.00 square metres.
Water, power and access
According to the Environmental Management Plan (EMP), the project will generate approximately 100 kilolitres per day (KLD) of sewage, which will be treated in an on-site STP. Treated water will be reused for gardening and flushing, with the surplus discharged into the Ahmedabad Municipal Corporation (AMC) drainage line.
For power, the applicant proposes a rooftop solar system with a capacity of 120 KW, requiring approximately 1,200.00 square metres of terrace space. Diesel Generator (DG) sets with acoustic enclosures will be provided for emergency backup. Rainwater harvesting will be managed through two percolating wells to recharge the groundwater.
Environmental safeguards
The applicant has allocated a capital budget of ‡2.54 crore for environmental management. A greenbelt covering 910.44 square metres (14.56% of the plot area) is planned, consisting of a 629.44 square metre lawn and a 281.00 square metre tree plantation area. The plantation program includes 157 trees of species such as Asopalav, Neem, Gulmohar, and Pipal.
Solid waste management involves source segregation. Organic waste will be treated using an automatic OWC with a capacity of 191 kg/day. For fire safety, the project will install wet risers, fire alarms, extinguishers, and a booster pump as per municipal regulations.
Corporate Environment Responsibility
The applicant has proposed a budget of ‡82.00 lakh (2% of the project cost) for Corporate Environment Responsibility (CER) activities over three years. These activities are targeted at the nearby villages of Raipur, Bhuvaladi, and Zanu, and include:
- Installing 12 KW and 10 KW solar rooftop systems in primary schools, Gram Panchayats, and post offices.
- Installing and maintaining six percolating wells for groundwater recharge.
- Providing Organic Waste Converters to the villages.
| Item | Detail |
|---|---|
| Total Built-up Area | 30,958.04 sq. m. |
| Residential Units | 108 |
| Commercial Units | 47 |
| STP Capacity | 100 KLD |
| Solar Power Capacity | 120 KW |
| Greenbelt Area | 910.44 sq. m. |
| Total Trees Planned | 157 |
| CER Budget | ‡82.00 lakh |
Royal Rudraksha site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is smaller than 51% of them.
268 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nikol, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sawera Shaligram — environmental approval granted, 250 m away
- Gulmohar Empire — environmental approval granted, 250 m away
- Shivay Lavis — environmental approval granted, 350 m away
- Radhika Royal — environmental approval granted, 350 m away
- Proposed Building Construction Project by Jay Somnath Developers — lapsed, 350 m away
- Swarit Sky — environmental approval granted, 400 m away
- Swarit Sky — environmental approval granted, 450 m away
- Proposed Building Construction Project by Satya Buildcon — lapsed, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.