Quick answers
What is this project?
New Residential Project "rajhans Unica" by Mr. Kiranbhai T. Bejanwala at Block No.: 435, T.P.S. No.: 11 (Adajan), O.P. No.: 54, F.P. No. : 86, Moje: Adajan, Ta.: Adajan, Dis.: Surat-395005 is an approved building project in Adajan, Majura, Surat, Gujarat. The site covers 3.7 acres.
Who is building it?
The applicant is Kirankumar Bejanwala.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Aug 2023), as of 27 Nov 2026.
Where is it?
In Adajan, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹192.5 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 24 Aug 2023.
Project details
| Official title | Proposed Construction of New Residential Project "rajhans Unica" by Mr. Kiranbhai T. Bejanwala at Block No.: 435, T.P.S. No.: 11 (Adajan), O.P. No.: 54, F.P. No. : 86, Moje: Adajan, Ta.: Adajan, Dis.: Surat-395005. |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kirankumar Bejanwala |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹192.5 crore |
| Village / locality | Adajan |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01311 |
What the filings say
What is planned
Rajhans Unica is a residential project proposed by Mr. Kiranbhai T. Bejanwala in Adajan, Surat. The applicant's conceptual plan describes the construction of seven residential towers (Type A to G) on a plot of 1.48 hectares (3.65 acres). The total built-up area is planned at 1,10,528.80 square metres.
The project will consist of 552 residential units, comprising 524 flats and 28 penthouses. Each of the seven buildings is designed with two basement levels, a ground floor, and 21 upper floors, reaching a height of 69.97 metres.
| Item | Detail |
|---|---|
| Total Residential Units | 552 (524 Flats + 28 Penthouses) |
| 2 BHK Units | 226 |
| 3 BHK Units | 310 (including 12 penthouses) |
| 4 BHK Penthouses | 16 |
| Total Built-up Area | 1,10,528.80 sq. m. |
| FSI Area | 59,188.00 sq. m. |
| Tallest Building Height | 69.97 m |
| Total Parking Area | 24,944.1 sq. m. |
Internal facilities will include earthquake-resistant Reinforced Cement Concrete (R.C.C.) design, granamite tile flooring, and fire safety provisions on all floors. Social infrastructure such as broadband and Wi-Fi connectivity is also planned within the site.
Layout and design
The site layout includes seven towers arranged around internal roads and open spaces. Parking is distributed across two basement levels, a hollow plinth, and open ground areas. Each building type features two staircases of 2.00-metre width, two common lifts, and one dedicated fire lift.
Land and surroundings
The project is located on private non-agricultural land. The site is situated approximately 0.44 km east of the Tapi River and 8.31 km west of National Highway 53 (NH-53). The Surat Railway Station is about 3.93 km to the east, while the Surat International Airport is 11.27 km to the southwest. The area is classified under Seismic Zone III. According to the project report, there are no national parks or wildlife sanctuaries within a 10 km radius.
Water, power and access
During the operational phase, the total water requirement is estimated at 307.0 kilolitres per day (KLD). Freshwater, sourced from the Surat Municipal Corporation, will account for 191.0 KLD during non-monsoon periods, with the remainder met through treated wastewater reuse for flushing, gardening, and vehicle washing. During the monsoon, freshwater demand is expected to be 300.0 KLD.
Power will be supplied by Dakshin Gujarat Vij Company Limited (DGVCL), with a total operational requirement of 3,427 KWH. Two diesel generator sets of 600 KVA each are planned as backup power sources.
Environmental safeguards
A sewage treatment plant (STP) will be installed to treat domestic wastewater. Treated water will be reused within the project, and the surplus (approximately 139 KLD to 145.3 KLD depending on the season) will be discharged into the municipal drainage system.
Solid waste management plans include the use of an organic waste converter (two units of 500 kg/day capacity) to process biodegradable waste into manure for use in the green belt. Non-biodegradable waste will be collected through door-to-door municipal facilities. The project proposes to plant 370 trees of various varieties along the internal roads and periphery, covering a total green area of 2,101.96 square metres.
Timeline
The project implementation is scheduled to take approximately 50 months from commencement. This includes 6 months for foundation work, 4 months for basement works, 25 months for the construction of the 21 floors, and various periods for finishing, plumbing, and electrification.
Mr. Kiranbhai T. New Residential Project "rajhans Unica" site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.7 acres, this one is larger than 86% of them.
103 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adajan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shreepad Central Vista — environmental approval granted, 1.3 km away
- Hasnain Heritage — initial checks, 1.6 km away
- River Vista — environmental approval granted, 1.8 km away
- Flood Protection Work in Tapi River at Surat, Gujarat by Surat Municipal… — lapsed, 1.9 km away
- Worldmark — environmental approval granted, 2 km away
- Proposed Metro Bridge Across River Tapi Adjoining Badrinarayn Temple station… — coastal clearance granted, 2.1 km away
- Shreepad Sunshine & Paramount — environmental approval granted, 2.1 km away
- Vitoria Prime — environmental approval granted, 2.2 km away