What is Shreepad Central Vista?
Shreepad Central Vista is an approved building project in Adajan, Majura, Surat, Gujarat. The site covers 0.8 acres.
Who is building it?
The applicant is Ajaykumar Bhathena.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2023), as of 27 Nov 2026.
Where is it?
In Adajan, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹65 crore and a site of 0.8 acres.
When was it filed?
The application was filed on 8 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Apr 2023 |
| Application filed | 8 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ajaykumar Bhathena |
| Land area | 3,300 m² |
| Project cost | ₹65 crore |
| Village / locality | Adajan |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01811 |
What the filings say
What is planned
Shreepad Central Vista is a proposed commercial building project by Ajaykumar Bhathena and others. The applicant's conceptual plan describes a single commercial building with three basement levels, a ground floor, and 12 upper floors. The total built-up area is 24,110.99 square metres on a plot of 0.33 hectares (0.81 acres).
The project is designed to accommodate 185 commercial units, consisting of 35 showrooms and 150 offices. The building reaches a maximum height of 44.90 metres. The applicant has submitted an undertaking that the commercial units will be used only for the storage of finished products and will not involve any manufacturing activities or the storage of hazardous materials such as chemicals, explosives, or flammable substances.
| Item | Detail |
|---|---|
| Total Plot Area | 3,290.60 sq. mt. |
| Total Built-up Area | 24,110.99 sq. mt. |
| FSI Area | 13,161.67 sq. mt. |
| Ground Coverage | 1,498.39 sq. mt. |
| Building Configuration | 3 Basements + Ground + 12 Floors |
| Total Commercial Units | 185 (35 Showrooms, 150 Offices) |
| Maximum Building Height | 44.90 metres |
| Expected Occupancy | 925 residents/users and 100 visitors |
Layout and design
The building layout includes three levels of basement parking. The ground floor is dedicated to showrooms and shops, while the upper floors are designed for office spaces. The design incorporates a common plot area of 335.91 square metres.
Vertical circulation is provided by six lifts, including one dedicated fire lift. The building features two staircases, each with a width of 2.02 metres. Parking is distributed across the basement levels and the hollow plinth, providing a total of 346 Equivalent Car Spaces (ECS).
Water, power and access
Water for the project will be supplied by the Surat Municipal Corporation (SMC). During the operation phase, the total water requirement is estimated at 35 kilolitres per day (KLD), of which 20 KLD will be fresh water and 15 KLD will be recycled water for flushing and gardening.
The electrical load demand is estimated at 1,000 KW, to be sourced from the Dakshin Gujarat Vij Company Limited (DGVCL). For backup power, the applicant proposes to install two silent diesel generator sets of 125 KVA each. Energy conservation measures include the installation of 185 solar panels on the rooftop with a total capacity of 100 KW, intended to power common area lighting and water pumps.
The site is accessed via a 46-metre wide public road. Two entry and exit gates are planned, along with two ramps for basement access.
Environmental safeguards
A Sewage Treatment Plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology with a capacity of 30 KLD will be installed. Treated wastewater will be reused for flushing and gardening, with the remaining 11 KLD discharged into the SMC drainage line.
For solid waste management, an organic waste convertor with a capacity of 100 kg/day will process wet waste on-site to create manure. Inorganic waste will be segregated and disposed of as per SMC practices. The project includes one rainwater harvesting percolation well with a depth of 40 metres.
A green belt of 350 square metres is planned, which includes the planting of 55 trees of species such as Gulmohar, Jambu, and Limdo. The applicant has budgeted ₹5.31 crore for the Environmental Management Plan, covering components like the STP, solar energy, and fire fighting systems.
Shreepad Central Vista site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.8 acres, this one is smaller than 98% of them.
102 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Adajan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Vista — environmental approval granted, 550 m away
- Proposed Metro Bridge Across River Tapi Adjoining Badrinarayn Temple station… — coastal clearance granted, 850 m away
- Flood Protection Work in Tapi River at Surat, Gujarat by Surat Municipal… — lapsed, 850 m away
- New Residential Project "rajhans Unica" by Mr. Kiranbhai T. Bejanwala at Block… — environmental approval granted, 1.3 km away
- Universal Commercial Capital — environmental approval granted, 1.4 km away
- Viceroy — environmental approval granted, 1.5 km away
- Universal Majesty — environmental approval granted, 1.6 km away
- Worldmark — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.