Environmental approval grantedBuildings & townships · Kachchh, Gujarat

SVCT Mundra

SVCT Mundra is an approved building project in Shiracha, Mundra, Kachchh, Gujarat. The site covers 44.7 acres. Its stated project cost is ₹625 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Jun 2024).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is SVCT Mundra?

SVCT Mundra is an approved building project in Shiracha, Mundra, Kachchh, Gujarat. The site covers 44.7 acres.

Who is building it?

The applicant is Adani Ports and Special Economic Zone Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 5 Jun 2024), as of 27 Nov 2026.

Where is it?

In Shiracha, Mundra, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹625 crore and a site of 44.7 acres.

When was it filed?

The application was filed on 5 Jun 2024.

Project details

StatusEnvironmental approval granted
Status since5 Jun 2024
Application filed5 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAdani Ports and Special Economic Zone Limited
Land area44.7 acres (18.1 ha)
Project cost₹625 crore
Village / localityShiracha
Taluk / tehsilMundra
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01330

What the filings say

What is planned

Adani Ports & Special Economic Zone Limited (APSEZ) proposes to develop SVCT Township (Phase I) in Shiracha, Mundra. The project is designed as a residential and commercial low-rise township exclusively for employees of the Adani Group of companies. The applicant's project report states that the development will be carried out in phases on a plot admeasuring 18.07 hectares (44.66 acres).

The project consists of 44 buildings with a total of 140.5 blocks. The residential component includes 1,488 dwelling units across 35 buildings, while the commercial and amenity zone includes hostel rooms, a community centre, and shopping complexes. The maximum building height is 12.75 metres.

ItemDetail
Total Built-up Area1,47,739.36 sq.m.
Total FSI Area1,22,729.54 sq.m.
Residential Units1,488 (1, 1.5, and 2 BHK)
Hostel Rooms276 (Twin sharing)
Total Occupancy10,255 persons
Total Parking Provision8,633 vehicles (34,095 sq.m.)
Estimated Project Cost₹625 crore

Layout and design

The township is divided into residential and commercial zones. The residential blocks are designed with a Ground + 3 floor configuration. The commercial zone includes a Community Center (G+2), two shopping complexes (G+1), a Hostel Amenity Building (G+1), and a Gate Complex (G+1).

Parking is planned on the ground floor (open surface) and in hollow plinths. The developer intends to provide 124 electric vehicle (EV) charging points, representing 8% of the Equivalent Car Space (ECS). The site layout includes a 12.0-metre wide Town Planning Scheme (TPS) road on the west, with internal roads ranging from 7.5 to 13.5 metres in width.

Land and surroundings

The project site is located at Survey Numbers 9/1, 6/1, and 21/2 in Shiracha village. The land is owned by APSEZ. According to the conceptual plan, the site is approximately 1.5 km from State Highway 6 (SH-6) and 11 km north of the Arabian Sea. The Bhuj Railway Station and Bhuj Airport are located approximately 46 km and 47 km away, respectively. The area falls within Seismic Zone V, which is classified as a very high damage risk zone.

Water, power and access

During the operational phase, the total fresh water requirement is estimated at 605.5 kilolitres per day (KLD). This will be sourced via a 5.1 km fixed pipeline from an APSEZ desalination plant located southwest of the site. A sewage treatment plant (STP) with a capacity of 750 KL will be installed to treat generated waste. Treated water (609 KLD) will be reused for flushing and gardening, with any surplus used for irrigation on nearby farmland.

Power requirements are estimated at 23.75 MW for operations, to be supplied by Paschim Gujarat Vij Company Limited (PGVCL). To supplement this, the applicant plans to install 2,220 solar panels on building terraces, generating 1,188 KW. Four diesel generator (DG) sets with a total capacity of 1,600 KVA will provide emergency backup.

Environmental safeguards

The developer has allocated ₹27 crore for environmental protection measures. A greenbelt covering 5.54 hectares (13.69 acres) is planned, consisting of 20,000 sq.m. of tree plantation (5,000 trees) and 35,401 sq.m. of lawn area. Species proposed include Asopalav, Neem, Garmala, and Gulmohur.

For rainwater management, 46 percolation wells reaching a depth of 60 metres will be installed to recharge the second river aquifer. Solid waste management includes an onsite organic waste converter with a capacity of 2,220 kg/day to process non-recyclable organic waste into manure for gardening.

SVCT Mundra site plan and layout

4 drawings from the project's filings. Sign in free to see them.

SVCT Mundra: Master plan: residential blocks, parking areas and internal road network (preview)🔒 Sign in free to see it
Master plan: residential blocks, parking areas and internal road network
SVCT Mundra: Location map: project site boundaries and coordinates (preview)🔒 Sign in free to see it
Location map: project site boundaries and coordinates
SVCT Mundra: Route map: pipeline from desalination plant to the township (preview)🔒 Sign in free to see it
Route map: pipeline from desalination plant to the township
SVCT Mundra: Sewage Treatment Plant: schematic flow diagram and layout (preview)🔒 Sign in free to see it
Sewage Treatment Plant: schematic flow diagram and layout

In context

76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 44.7 acres, this one is larger than 71% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shiracha, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (10.2 km away).

Other projects nearby

More from Adani Ports and Special Economic Zone Limited in Kachchh

All 29 Adani Ports and projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.