What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

60000 TPA Copper tube plant by Kutch Copper Tubes Ltd at APSEZ, Survey no 223, Village Navinal, Mundra, Kutch district, Gujarat

60000 TPA Copper tube plant by Kutch Copper Tubes Ltd at APSEZ, Survey no 223, Village Navinal, Mundra, Kutch district, Gujarat is a proposed industrial project in Navinal, Mundra, Kachchh, Gujarat. The site covers 10 acres. Its stated project cost is ₹1,194 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Dec 2023).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

60000 TPA Copper tube plant by Kutch Copper Tubes Ltd at APSEZ, Survey no 223, Village Navinal, Mundra, Kutch district, Gujarat is a proposed industrial project in Navinal, Mundra, Kachchh, Gujarat. The site covers 10 acres.

Who is building it?

The applicant is Kutch Copper Tubes Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Dec 2023), as of 27 Nov 2026.

Where is it?

In Navinal, Mundra, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹1,194 crore and a site of 10 acres.

When was it filed?

The application was filed on 2 Dec 2023.

Project details

Official titleSetting up of 60000 TPA Copper tube plant by Kutch Copper Tubes Ltd at APSEZ, Survey no 223, Village Navinal, Mundra, Kutch district, Gujarat
StatusCleared for impact study
Status since2 Dec 2023
Application filed2 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKutch Copper Tubes Limited
Land area10 acres (4.1 ha)
Project cost₹1,194 crore
Village / localityNavinal
Taluk / tehsilMundra
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01039

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10 acres, this one is smaller than 75% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Navinal, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (7.9 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.