Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Feb 2024 |
| Application filed | 21 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Rutain Pharma Chem |
| Land area | 2,200 m² |
| Project cost | ₹6 crore |
| Village / locality | Piraman |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Village |
| Our reference | WID-GJ-01343 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 Nov 2023 (this page) | Environmental approval granted | 0.5 acres | ₹6 crore |
| Early planning filed 12 Nov 2022 | Cleared for impact study | 0.5 acres | ₹6 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 89% of them.
Where it is
Piraman, Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Waste management project by M/s. Narmada Clean Tech (NCT) — cleared for impact study, 800 m away
- Waste management project by M/s. Ankleshwar Waste Management Association — cleared for impact study, 1.1 km away
- Waste management project by M/s. Ankleshwar Waste Management Association — returned to applicant, 1.1 km away
- Waste management project by M/s. Ankleshwar Waste Management Association — lapsed, 1.1 km away
- Laying proposed 8" Ø Steel Gas pipeline by GAIL — lapsed, 1.2 km away
- Project by M/s. Zydus Lifescience Ltd. (Unit-II) — initial checks, 1.5 km away
- Diversion Of 0.1141 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 1.6 km away
- Proposed modernization in existing Synthetic Organic Chemicals unit of M/s.… — returned to applicant, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.