Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 May 2026 |
| Application filed | 6 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Narmada Clean Tech |
| Land area | 69 acres (27.9 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Ankleshvar (M) |
| Taluk / tehsil | Anklesvar |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07559 |
In context
21 applications in Bharuch since January 2022 are in the same category (Waste management): 9 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 69 acres, this one is larger than 67% of them.
190 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ankleshvar (M), Anklesvar, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying proposed 8" Ø Steel Gas pipeline by GAIL — lapsed, 750 m away
- Proposed Bulk Drugs and Drug Intermediates Manufacturing Unit in Existing… — environmental approval granted, 800 m away
- Waste management project by M/s. Ankleshwar Waste Management Association — cleared for impact study, 1.9 km away
- Waste management project by M/s. Ankleshwar Waste Management Association — returned to applicant, 1.9 km away
- Waste management project by M/s. Ankleshwar Waste Management Association — lapsed, 1.9 km away
- Diversion Of 0.1141 Ha. Protected Forest Land For The Grant Permission For… — lapsed, 2.1 km away
- Ec for Drilling and Development of 12 Development Wells in Ankleshwar Block — environmental approval granted, 2.2 km away
- Ec for Drilling and Development of 12 Development Wells in Ankleshwar Block — cleared for impact study, 2.2 km away
More from Narmada Clean Tech in Bharuch
- Change in Design and Specification of Diffuser to Facilitate Enhancement of… — lapsed
- Permission for providing Approach Road from the road-side shoulder of SH-6… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.