Quick answers
What is Industrial project by Rama Cylinders PVT LTD?
This proposed industrial project by Rama Cylinders PVT LTD is in Bhimasar, Anjar, Kachchh, Gujarat. The site covers 28.4 acres.
Who is building it?
The applicant is Rama Cylinders Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Mar 2023), as of 27 Nov 2026.
Where is it?
In Bhimasar, Anjar, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹120.2 crore and a site of 28.4 acres.
When was it filed?
The application was filed on 6 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 6 Mar 2023 |
| Application filed | 6 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rama Cylinders Private Limited |
| Land area | 28.4 acres (11.5 ha) |
| Project cost | ₹120.2 crore |
| Village / locality | Bhimasar |
| Taluk / tehsil | Anjar |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01590 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 28.4 acres, this one is smaller than 57% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhimasar, Anjar, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- No Increase in Pollution Load application for Speciality chemicals… — initial checks, 1.8 km away
- Expansion of existing Chlor-Alkali, Synthetic Organic Units & Captive Power… — environmental approval granted, 1.9 km away
- Expansion of existing Chlor-Alkali, Synthetic Organic Units & Captive Power… — lapsed, 1.9 km away
- No Increase in Pollution Load application for Speciality chemicals… — initial checks, 2.4 km away
- Proposed Expansion (less than 20 % of earlier approved production capacity) in… — environmental approval granted, 2.5 km away
- Proposed Expansion (less than 40 % of earlier approved production capacity) in… — returned to applicant, 2.5 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC line Route : Padana-Bhimasar Village… — forest land use approved, 2.7 km away
- Addition Of Formaldehyde Based Resin Plant (Phenol, Melamine & Urea) In The… — cleared for impact study, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.