What is Developing? Open the mapMap

Cleared for impact studyIndustry · Kachchh, Gujarat

Addition Of Formaldehyde Based Resin Plant (Phenol, Melamine & Urea) In The Existing Laminate Sheets Manufacturing Unit at Survey No: 52/2, 53/1, Near Vanshika Plywood, Village- Varsana, Tal: Anjar, Dist.: Kachchh-370240, Gujarat By M/S. Nakoda Bhairav Laminates LLP

Addition Of Formaldehyde Based Resin Plant (Phenol, Melamine & Urea) In The Existing Laminate Sheets Manufacturing Unit at Survey No: 52/2, 53/1, Near Vanshika Plywood, Village- Varsana, Tal: Anjar, Dist.: Kachchh-370240, Gujarat By M/S. Nakoda Bhairav Laminates LLP is a proposed industrial project in Chirai Nani, Bhachau, Kachchh, Gujarat. The site covers 3.7 acres. Its stated project cost is ₹23.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 26 Jul 2024).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Addition Of Formaldehyde Based Resin Plant (Phenol, Melamine & Urea) In The Existing Laminate Sheets Manufacturing Unit at Survey No: 52/2, 53/1, Near Vanshika Plywood, Village- Varsana, Tal: Anjar, Dist.: Kachchh-370240, Gujarat By M/S. Nakoda Bhairav Laminates LLP is a proposed industrial project in Chirai Nani, Bhachau, Kachchh, Gujarat. The site covers 3.7 acres.

Who is building it?

The applicant is Nakoda Bhairav Laminates LLP.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 26 Jul 2024), as of 27 Nov 2026.

Where is it?

In Chirai Nani, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹23.3 crore and a site of 3.7 acres.

When was it filed?

The application was filed on 21 Jul 2024.

Project details

StatusCleared for impact study
Status since26 Jul 2024
Application filed21 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNakoda Bhairav Laminates LLP
Land area3.7 acres (1.5 ha)
Project cost₹23.3 crore
Village / localityChirai Nani
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-04428

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 91% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chirai Nani, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.