Quick answers
What is this project?
This approved industrial project by M/s. Madelin Enterprises Private Limited - Application for Transfer of Environmental Clearance from M/s. JBF Industries Limited. to M/s. Madelin Enterprises Private Limited., granted for manufacturing of Polyester Chips & Captive Power generation. is in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 14.8 acres.
Who is building it?
The applicant is Madelin Enterprises Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Feb 2024), as of 27 Nov 2026.
Where is it?
In Sarigam, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹252.5 crore and a site of 14.8 acres.
When was it filed?
The application was filed on 6 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Feb 2024 |
| Application filed | 6 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Madelin Enterprises Private Limited |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹252.5 crore |
| Village / locality | Sarigam |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01609 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 14.8 acres, this one is larger than 94% of them.
129 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarigam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Koel Colours Pvt. Ltd. — environmental approval granted, 150 m away
- Industrial project by M/s. Aarti Drugs Ltd. — under environmental review, 150 m away
- Project by Aarti Drugs Ltd. — initial checks, 150 m away
- Proposed expansion project for the manufacturing of Methyl Bromide from 50 TPM… — under environmental review, 200 m away
- Change in Product Mix forM/s. Concare Coating & Chemicals - Plot No. C1… — initial checks, 250 m away
- Proposed Change in Product Mix With No Increase in Pollution Load by M/S… — initial checks, 450 m away
- Proposed Expansion in Existing Plant Capacity (Non-Ec Products) by Addition of… — environmental approval granted, 500 m away
- Proposed Expansion in Existing Plant Capacity (Non-Ec Products) by Addition of… — cleared for impact study, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.