Quick answers
What is Industrial project by M/s. Koel Colours Pvt. Ltd.?
This approved industrial project by M/s. Koel Colours Pvt. Ltd. is in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 1 acre.
Who is building it?
The applicant is Koel Colours Private Limi Ted.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Jun 2026), as of 27 Nov 2026.
Where is it?
In Sarigam, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹11.6 crore and a site of 1 acre.
When was it filed?
The application was filed on 3 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jun 2026 |
| Application filed | 3 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Koel Colours Private Limi Ted |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹11.6 crore |
| Village / locality | Sarigam |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07266 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 65% of them.
129 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarigam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project by Aarti Drugs Ltd. — initial checks, 50 m away
- Industrial project by M/s. Aarti Drugs Ltd. — under environmental review, 100 m away
- Change in Product Mix forM/s. Concare Coating & Chemicals - Plot No. C1… — initial checks, 100 m away
- Industrial project by M/s. Madelin Enterprises Private Limited - Application… — environmental approval granted, 150 m away
- Proposed expansion project for the manufacturing of Methyl Bromide from 50 TPM… — under environmental review, 200 m away
- Proposed Change in Product Mix With No Increase in Pollution Load by M/S… — initial checks, 400 m away
- Industrial project by M/s. Nivaan Industries Private Limited — environmental approval granted, 450 m away
- Proposed Expansion in Existing Plant Capacity (Non-Ec Products) by Addition of… — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.