Environmental approval grantedBuildings & townships · Surat, Gujarat

Milestone Niyaara

Milestone Niyaara is an approved building project in Althan, Majura, Surat, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹49.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Oct 2023).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Milestone Niyaara?

Milestone Niyaara is an approved building project in Althan, Majura, Surat, Gujarat. The site covers 1.3 acres.

Who is building it?

The applicant is Viren Munjani.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Oct 2023), as of 27 Nov 2026.

Where is it?

In Althan, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹49.8 crore and a site of 1.3 acres.

When was it filed?

The application was filed on 16 Oct 2023.

Project details

StatusEnvironmental approval granted
Status since16 Oct 2023
Application filed16 Oct 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantViren Munjani
Land area1.3 acres (0.5 ha)
Project cost₹49.8 crore
Village / localityAlthan
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-01764

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 26 May 2025Lapsed1.3 acres₹49.8 crore
New project filed 16 Oct 2023 (this page)Environmental approval granted1.3 acres₹49.8 crore

What the filings say

What is planned

Milestone Niyaara is a residential high-rise project proposed by the applicant, Viren Munjani, on a plot of 0.53 hectares (1.31 acres). The project report describes the construction of three buildings (Blocks A, B-C, and D) with a total of 156 residential units.

The proposed building configuration for all blocks is two basement levels, a ground floor, and 14 upper floors, reaching a height of 44.98 metres. The residential units are planned as follows:

The project has a total built-up area of 34,658.59 square metres and a Floor Space Index (FSI) area of 21,253.83 square metres.

Layout and design

The site layout includes a common plot area of 531.61 square metres. Internal roads within the project are planned with a width of 7.50 metres. The ground floor of the buildings will feature foyers and passage areas, while the basements are dedicated to parking and mechanical services, including exhaust ducts.

Parking is distributed across the ground level and two basement floors. The applicant proposes a total of 236 car parking spaces and 697 two-wheeler spaces. Specifically, the ground level will accommodate 45 cars and 141 two-wheelers, the first basement will have 97 cars and 225 two-wheelers, and the second basement will provide 94 car spaces and 331 two-wheeler spaces.

Water, power and access

The total water requirement during the operation phase is estimated at 95 kilolitres per day (KLD). Of this, 57 KLD will be fresh water supplied by the Surat Municipal Corporation (SMC), while the remaining 38 KLD will be met through treated sewage for flushing and gardening.

Power will be sourced from the local grid, with a 100 kVA diesel generator (DG) set proposed for emergency backup. The applicant also plans to install 60 kW of rooftop solar power, requiring approximately 360 square metres of terrace space. The site is accessible via a 24.00-metre wide Development Plan (DP) road.

Environmental safeguards

The applicant's Environmental Management Plan (EMP) includes an on-site Sewage Treatment Plant (STP) with a capacity of 100 KLD. For solid waste, an automatic Organic Waste Convertor (OWC) with a capacity of 250 kg per day is planned to treat biodegradable waste.

Rainwater harvesting will be managed through a collection system and two percolation wells. The green belt development plan covers 856.53 square metres (approximately 16.11% of the plot area), which includes 324.92 square metres of tree-covered area and 531.61 square metres of lawn. The applicant intends to plant 140 trees of indigenous species such as Neem, Asopalav, and Gulmohar.

ItemDetail
Total Built-up Area34,658.59 sq.m.
FSI Area21,253.83 sq.m.
Total Residential Units156
Total Car Parking236 spaces
Total Two-Wheeler Parking697 spaces
STP Capacity100 KLD
Solar Power Capacity60 kW
Estimated Project Cost₹49.84 crore

Timeline

The applicant's budgetary plan for the Environmental Management Plan indicates that the project is expected to be completed within approximately four years from the start of construction.

Milestone Niyaara site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Milestone Niyaara: Site layout plan: building blocks, internal roads, and common plot (preview)🔒 Sign in free to see it
Site layout plan: building blocks, internal roads, and common plot
Milestone Niyaara: Parking layout: ground floor and basement parking arrangements (preview)🔒 Sign in free to see it
Parking layout: ground floor and basement parking arrangements
Milestone Niyaara: Elevation and section of Block A (preview)🔒 Sign in free to see it
Elevation and section of Block A
Milestone Niyaara: Typical floor plan for Block A (1st to 13th floors) (preview)🔒 Sign in free to see it
Typical floor plan for Block A (1st to 13th floors)

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 64% of them.

138 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Althan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.