Quick answers
What is Milestone Niyaara?
Milestone Niyaara is a lapsed building project in Althan, Majura, Surat, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Viren Munjani.
Has it been approved?
No. The application was lapsed on 22 Sept 2025, so it is no longer under consideration.
Where is it?
In Althan, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹49.8 crore and a site of 1.3 acres.
When was it filed?
The application was filed on 26 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Milestone Niyaara
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Sept 2025 |
| Application filed | 26 May 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Buildings & townships |
| Applicant | Viren Munjani |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹49.8 crore |
| Village / locality | Althan |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-09088 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 26 May 2025 (this page) | Lapsed | 1.3 acres | ₹49.8 crore |
| New project filed 16 Oct 2023 | Environmental approval granted | 1.3 acres | ₹49.8 crore |
What the filings say
What is planned
Milestone Niyaara is a residential high-rise project proposed by the applicant, Viren Munjani, on a plot of 0.53 hectares (1.31 acres). The project report describes the construction of three buildings (Blocks A, B-C, and D) with a total of 156 residential units.
The proposed building configuration for all blocks is two basement levels, a ground floor, and 14 upper floors, reaching a height of 44.98 metres. The residential units are planned as follows:
- Block A: 52 units of 3 BHK configuration.
- Block B-C: 52 units of 3 BHK configuration.
- Block D: 26 units of 2 BHK and 26 units of 3 BHK configuration.
The project has a total built-up area of 34,658.59 square metres and a Floor Space Index (FSI) area of 21,253.83 square metres.
Layout and design
The site layout includes a common plot area of 531.61 square metres. Internal roads within the project are planned with a width of 7.50 metres. The ground floor of the buildings will feature foyers and passage areas, while the basements are dedicated to parking and mechanical services, including exhaust ducts.
Parking is distributed across the ground level and two basement floors. The applicant proposes a total of 236 car parking spaces and 697 two-wheeler spaces. Specifically, the ground level will accommodate 45 cars and 141 two-wheelers, the first basement will have 97 cars and 225 two-wheelers, and the second basement will provide 94 car spaces and 331 two-wheeler spaces.
Water, power and access
The total water requirement during the operation phase is estimated at 95 kilolitres per day (KLD). Of this, 57 KLD will be fresh water supplied by the Surat Municipal Corporation (SMC), while the remaining 38 KLD will be met through treated sewage for flushing and gardening.
Power will be sourced from the local grid, with a 100 kVA diesel generator (DG) set proposed for emergency backup. The applicant also plans to install 60 kW of rooftop solar power, requiring approximately 360 square metres of terrace space. The site is accessible via a 24.00-metre wide Development Plan (DP) road.
Environmental safeguards
The applicant's Environmental Management Plan (EMP) includes an on-site Sewage Treatment Plant (STP) with a capacity of 100 KLD. For solid waste, an automatic Organic Waste Convertor (OWC) with a capacity of 250 kg per day is planned to treat biodegradable waste.
Rainwater harvesting will be managed through a collection system and two percolation wells. The green belt development plan covers 856.53 square metres (approximately 16.11% of the plot area), which includes 324.92 square metres of tree-covered area and 531.61 square metres of lawn. The applicant intends to plant 140 trees of indigenous species such as Neem, Asopalav, and Gulmohar.
| Item | Detail |
|---|---|
| Total Built-up Area | 34,658.59 sq.m. |
| FSI Area | 21,253.83 sq.m. |
| Total Residential Units | 156 |
| Total Car Parking | 236 spaces |
| Total Two-Wheeler Parking | 697 spaces |
| STP Capacity | 100 KLD |
| Solar Power Capacity | 60 kW |
| Estimated Project Cost | ₹49.84 crore |
Timeline
The applicant's budgetary plan for the Environmental Management Plan indicates that the project is expected to be completed within approximately four years from the start of construction.
Milestone Niyaara site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 64% of them.
138 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Althan, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Milestone Niyaara — environmental approval granted, 0 m away
- Building project by M/s. Jainam Corporate Office — initial checks, 150 m away
- Building project by M/s. Jainam Corporate Office — environmental approval granted, 150 m away
- Shreevana — initial checks, 200 m away
- Skycity Universe — environmental approval granted, 350 m away
- The Antriksh — environmental approval granted, 600 m away
- Vrajbhumi Icon — environmental approval granted, 650 m away
- "nemi Elements" — environmental approval granted, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.